Forum quick links
manage (rainwater) on site
NC-v4 SSc4:Rainwater managementposted by Manuel Martin Delgado on
Hi, Is reusing rainwater for flushing toilets an accepted solution for achieving this credit? Or is reusing for irrigation the only solution accepted? Thanks.
Zero Lot Line calc
NC-v4 SSc4:Rainwater managementposted by Janika McFeely on
Does anyone have more detail on the FAR requirement for documenting a zero lot line project? Is it like the density credit in that you only need to include buildable land?
Campus application
NC-v4 SSc4:Rainwater managementposted by Rob Hink on
Our LEED project site falls within a larger medical campus which has a campus-wide stormwater management plan which meets the credit requirements.
Green roof compliance on runoff
NC-v4 SSc4:Rainwater managementposted by Filipe Boni on
Hi! I'm working on a green roof over a building in IP and want to understand what system (extensive, etc)would be better. I was able to calculate the 95th percentile of my site (46mm) and the Sma
Rainwater Management
NC-v4 SSc4:Rainwater managementposted by Maria Glädt on
We are planning to follow option 2 (Natural Land Cover Conditions). The area consists mainly in clay with very low infiltration capacity.
n/a
NC-v4 SSc4:Rainwater managementposted by Anastasia Makarenko on
Dear all, we're planning to install tank for collecting 180% of stormwater from 95 percentile rainfall event.
correction for online reference guide
NC-v4 SSc4:Rainwater managementposted by Lyle Axelarris on
I have subscribed to access for the online v4 Reference Guide, and I noticed a couple of mistakes in the example for this credit.
Option 2
NC-v4 SSc4:Rainwater managementposted by henry nguyen on
Hello, I wonder how should I understand Opt.2 BD+C Rain water Mgmt credit. "Manage on site the annual increase in runoff volume from the natural land cover condition to the post-developed conditio
natural land cover conditions in a portion of project site
NC-v4 SSc4:Rainwater managementposted by Noriko Nagazumi on
Hi, Our project site contains a portion of natural land cover conditions site and previously developed site.Shall we use option 1, or shall we use combined option 1 and 2, such as using option 1
compliant strategies
NC-v4 SSc4:Rainwater managementposted by Emmanuel Pauwels on
We have a project with an underground parking which covers the whole site.