Forum quick links
Compliance in early construction
NC-v4 SSp1:Construction activity pollution preventionposted by ARDOR GREEN on
Dear all,
Substantial differences between the CGP from 2012 as required in LEED V4?
NC-v4 SSp1:Construction activity pollution preventionposted by veronica oyarzun on
Can anyone please tell me how different should be documenting this credit comparing with LEED 2009?
Acceptable Measures to avoid discharges of fuel
NC-v4 SSp1:Construction activity pollution preventionposted by Instra Ingenieros on
The CGP 2020 specify the next in the section 2.3.1. Prohibited Discharges " 2.3.1.3 Fuel, oils or other pollutans used in vehicle and equipment operation and maintenance.
Applicability within campus boundary limits
NC-v4 SSp1:Construction activity pollution preventionposted by Samer Alhmdan on
Hello, I have multiple buildings within a campus, do we need to implement this prerequisite within the whole campus boundaries, or only within buildings LEED boundaries, noting that there are some
ESC plan for major renovation of data center
NC-v4 SSp1:Construction activity pollution preventionposted by sean wang on
We met a confused case. As it is a major renovation for data center, there is no need for controlling soil erosion, waterway sedimentation for construction.
CAPP Plan
NC-v4 SSp1:Construction activity pollution preventionposted by UGC/GPRO Office Account on
Hello, Does anyone have a Construction Activity Pollution Prevention plan example? What does it include? Erosion control, light pollution prevention, stormwater management plan
ESC plan
NC-v4 SSp1:Construction activity pollution preventionposted by Ana Paula Quiros on
Hello, There is a hotel that might look certification and has 2 floors already built, then the construction stopped and they want to add now 3 more floors.
ESC plan for major renovation of data center
NC-v4 SSp1:Construction activity pollution preventionposted by sean wang on
Here is a major renovation project for data center. Only structure reinforcement is required for major renovation.
EPA New Version
NC-v4 SSp1:Construction activity pollution preventionposted by Jennifer Webb on
The EPA has issued the 2017 Construction General Permit (see web page https://www.epa.gov/npdes/stormwater-discharges-construction-activities-2017-cgp) that became effective on February 16, 2017.
Erosion and Sedimentation Measures during demolition
NC-v4 SSp1:Construction activity pollution preventionposted by Anaïs P on
During demolition works, should the Erosion and Sedimentation measures be implemented? The Reference Guide only refers to construction works...