Post a question or comment
Credit Filters
Integrative process
Filter by location
Forum
Topic
Replies
Recent

What about Site Selection?

NC-v4 IPc1:Integrative process
posted by  Michelle Rosenberger  on 

Hi Marcus, So I'm confused. LEEDuser's preamble above indicates any project can get this credit, and you're not required to implement anything just analyze.

3
Default Avatar
architect
LEEDuser Basic Member
5 thumbs up
Mon Jul 9, 2018, 1:39 pm

HVAC System Selection

NC-v4 IPc1:Integrative process
posted by  Dave Hubka  on 

It doesn't seem like the credit requires evaluation of various HVAC systems (e.g. radiant heat vs forced air heat, packaged cooling vs split systems, etc.).

3
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Thu May 10, 2018, 2:21 pm

Adoption of Investigated Strategies

NC-v4 IPc1:Integrative process
posted by  Philippa Cameron  on 

Do you need to adopt all strategies that you demonstrate as facilitating best energy performance for this credit?

1
Wed Oct 28, 2015, 3:31 pm

simple box model

NC-v4 IPc1:Integrative process
posted by  Courtney Royal  on 

how do you define a simple box model? for example, do you need to model thermal zones, etc.

1
Wed Apr 26, 2017, 2:01 pm

FAO EToCalc software help

NC-v4 IPc1:Integrative process
posted by  S. Sachs  on 

Hello, I'm working on a project in Kuwait and need to achieve the IPc1 credit for water consumption. I've been struggling to use the LEED-recommended ETo calculator tool, produced by the FAO, whi

1
Thu Oct 18, 2018, 7:32 pm

Can I omit the IP credit since it is stand alone?

NC-v4 IPc1:Integrative process
posted by  wachira sosaeng  on 

Generally,in other categories, we have to perform to meet all prerequisites though we don't need any credits in the categories (suppose that we have enough credits that meet our goal.

1
Mon Aug 1, 2016, 3:21 pm

Design Build Projects

NC-v4 IPc1:Integrative process
posted by  Michelle Rosenberger  on 

Our region primarily uses design build which means that there are two very separate Schematic Design processes for our projects.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed May 3, 2017, 4:58 pm

Energy-related systems

NC-v4 IPc1:Integrative process
posted by  Lise Dannesboe  on 

Hi! We did some parameter studies in the early stage of the design process. Now i am wondering if we can use them for documentation of this credit.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Aug 15, 2016, 7:02 am

Integrative Process (IP) Guide 2.0

NC-v4 IPc1:Integrative process
posted by  Vitor Tosetto   on 

Please, someone knows where can I buy the Integrative Process (IP) ANSI Consensus National Standard Guide© 2.0? In ANSI's webstore I found v1.0 only.

10
Thu Aug 4, 2016, 3:37 pm

Must non-potable water sources be used to earn IP credit?

NC-v4 IPc1:Integrative process
posted by  Eesmyal Santos-Brault  on 

It appears that this credit can not be earned if a project does not meet some water demand through nonpotable sources.

7
Mon Aug 17, 2015, 8:02 pm