Post a question or comment
Credit Filters
Minimum energy performance
Filter by location
Forum
Topic
Replies
Recent

Energy Star Related Product

Retail-CI-v2009 EAp2:Minimum energy performance
posted by  Wei Zeng  on 

Hello: I am working on a convenience store applying for LEED CI Retail 2009 certification, the project plans to design two outdoor air-cooled condensing unit which would be used as the cooling

1
Wed Oct 26, 2016, 9:58 pm

Additional Interior Lighting power

Retail-CI-v2009 EAp2:Minimum energy performance
posted by  Luana Bertoletti  on 

I'm working on a project that has a space which is eligible for additional interior lighting.

1
Tue Jan 15, 2013, 1:14 pm

Energy Star Alternative

Retail-CI-v2009 EAp2:Minimum energy performance
posted by  Cesar Ruiz  on 

A refrigerator labeled 'California Energy Commission Certificated' is valid as an alternative for an Energy Star qualified equipment?

0

Ballast

Retail-CI-v2009 EAp2:Minimum energy performance
posted by  John Kitsalis  on 

Hello, My question concerns the topic of Watts per luminaire. I am to determine how many Watts there are per luminaire.

1
Tue Jan 15, 2013, 1:13 pm

Light Power Density Calculated Method

Retail-CI-v2009 EAp2:Minimum energy performance
posted by  John Kitsalis  on 

I understand that their are two methods to calculating the LPD. In the process of selecting which method to choose, are there any requirements that the project must meet?

1
Fri Mar 7, 2014, 3:44 pm

ASHARAE 90.1 HVAC terminolgy

Retail-CI-v2009 EAp2:Minimum energy performance
posted by  FABIO VIERO  on 

Hello all. I have some questions about the terminology of the HVAC's components. 1) Could a typical rooftop for retails ( http://www.directindustry.com/prod/ciat/self-contained-rooftop-air-conditio

0

Space by Space method

Retail-CI-v2009 EAp2:Minimum energy performance
posted by  Tejaswi Damaraju  on 

Hello, I am working for a Retail-commercial interiors project with less than 5000 Sq feet of space.

0

New purchases Energy Star

Retail-CI-v2009 EAp2:Minimum energy performance
posted by  Cesar Ruiz  on 

In the EAp2 and EAc1.4 for LEED CI v2009, you established that projects may include only new equipment and appliances purchased for the LEED-CI scope of work in the list for Energy Star rated equip

2
Thu Jun 25, 2015, 3:22 pm