NO HVAC INSTALATION - C&S IEQ Credit 3.1

CS-2009 IEQc3:Construction IAQ Management Plan—During Construction
posted by  Gabriel Yurevich  on 

Hi everybody. We are in the design phase of a CS small building certification. In which we dont project any HVAC installaction in scope.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Sep 4, 2024, 8:01 am

Occupancy date for Core and Shell

CS-2009 IEQc3:Construction IAQ Management Plan—During Construction
posted by  Edgar Arevalo  on 

Regarding the MERV-8 filter section of this credit, which is for a C&S project, no tenant occupancy dates have been established.  Should I just wait til we get the first tenant occupancy d

0

SMACNA Ductwork Protection Guidelines

CS-2009 IEQc3:Construction IAQ Management Plan—During Construction
posted by  Ciaran McCabe  on 

In order to qualify for this credit is it acceptable if the duct work is wrapped once it arrived on site OR should it arrive pre-wrapped.

1
Tue Nov 8, 2016, 11:52 pm

C&S building with partial occupancy during construction

CS-2009 IEQc3:Construction IAQ Management Plan—During Construction
posted by  Rubén M. R.  on 

Our 23-story building is about to start partial occupancy at floor 12th. The building's AHU will be controlled by a variable speed drive which will regulate automatically the air supply quantity t

1
Mon Nov 21, 2011, 3:35 am

Plastic Sheeting to Protect Raised Technical Floor

CS-2009 IEQc3:Construction IAQ Management Plan—During Construction
posted by  Ian McCall  on 

Hello, The installation contractors state that on previous LEED projects they have placed down plastic sheeting down in order to protect the raised technical floor.

1
Thu Jan 19, 2017, 10:48 am

Scheduling for CS

CS-2009 IEQc3:Construction IAQ Management Plan—During Construction
posted by  BH .  on 

Dear all, we are making Core Shell project. Is it necessary to take into consideration flush out procedure during preparation of IAQ management plan in scheduling point?

1
Mon Nov 21, 2011, 3:30 am

EXTRACTION DUCTS AND FANS

CS-2009 IEQc3:Construction IAQ Management Plan—During Construction
posted by  Michael E. Edmonds-Bauer  on 

This might sound obvious, but we wanted to double check. Regarding underground parking encloused parking (no natural ventilation at all), there always will be fans to "push" the air towards the ex

1
Mon Nov 4, 2013, 5:59 pm

How to deal with insecticide?

CS-2009 IEQc3:Construction IAQ Management Plan—During Construction
posted by  Gabriela Hernández Castillo  on 

Our project is located at an area where COMEJEN is usual due to a very humid climate. COMEJEN is a sort of termite who lives in concrete cracks.

1
Fri Mar 11, 2011, 4:43 am
1
Thu May 13, 2010, 1:35 pm

Filter Replacement

CS-2009 IEQc3:Construction IAQ Management Plan—During Construction
posted by  Andrew Ellsworth  on 

BACKGROUND: We have a project that is an office building pursuing LEED-CS 2009 certification. The C&S was substantially complete within the last several weeks.

1
Thu Dec 18, 2014, 4:42 pm