CS-2009 IEQp1:Minimum IAQ Performanceposted by Adriana Hansen on
We have an HVAC system configured with ceiling plenum return. Is this plenum required to meet item (§ 5.5.1) Resistance to Mold Growth and (§ 5.5.2) Resistance to Erosion of ASHRAE 62.1?
Zone Air Distribution Effectiveness
CS-2009 IEQp1:Minimum IAQ Performanceposted by Noriko Nagazumi on
Let me confirm the following ASHRAE 62.1-2007 Zone Air Distribution Effectiveness (Ez) issue. Our project utilizes total heat exchangers for ventilation.
Occupant Density - Filling out the IEQp1 form
CS-2009 IEQp1:Minimum IAQ Performanceposted by Ron Dean on
Hello, I have two specific questions, please help me working them out. 1.
ASHRAE Standard
CS-2009 IEQp1:Minimum IAQ Performanceposted by ilkyaz ceren güçlü on
Hello, We are carrying out LEED certification of an office building.
Confidential lease agreements cannot be obtained
CS-2009 IEQp1:Minimum IAQ Performanceposted by John Mader on
Our project is an office building with some retail spaces on its lower floors that have already been leased.
Operable Windows
CS-2009 IEQp1:Minimum IAQ Performanceposted by Luis Miguel Diazgranados on
We are working on a natural ventilated CS office building. The Leedonline form asks to fill in a table with the operable window area, in order to calculate ratio of window to occupiable area.
ASHRAE Standard 62.1 - 2010
CS-2009 IEQp1:Minimum IAQ Performanceposted by Maya Karkour on
Hello, Does anyone know if the ventilation system/strategy of a LEED 2009 project can be designed according to ASHRAE 62.1-2010 instead of 62.1-2007? I haven't looked at the 2010, but I heard the
Minimum IAQ Requirement: Ashrae 62.1 vs. Ashrae 170
CS-2009 IEQp1:Minimum IAQ Performanceposted by Daniel Joseph on
We are in the midst of certifying a Medical office core and shell building. Our scope includes the landscaping, parking lot, side walks, and building shell.
Multiple AHU's serving one zone
CS-2009 IEQp1:Minimum IAQ Performanceposted by Lavanya Veerappa on
Hi, I am working on C & S project wherein 4 AHU's are serving an entire office area per floor.
Cold Shell compliance path
CS-2009 IEQp1:Minimum IAQ Performanceposted by Brightworks Sustainability on
Hi all, I'm working on a cold dark shell project where the owner is NOT building out any HVAC systems (only plumbing); the tenant will install everything.