Is EAc2 affected by the use of the ACP calculation for EAc1?

CS-2009 EAc2:On-site Renewable Energy
posted by  Charlie Christenson  on 

Working on a core & shell project that is planning to install a PV system sized to offset 1% of total building energy cost.

3
Thu Mar 26, 2015, 7:05 pm

Reference for the building annual energy cost

CS-2009 EAc2:On-site Renewable Energy
posted by  Ricardo Sá  on 

In a Core&Shell project, the percentage of renewable energy integration shall be refered to the total building energy use (including tenants areas) or only to core and shell energy use ?

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Mar 24, 2014, 5:02 pm

PV System as part of a Master Site

CS-2009 EAc2:On-site Renewable Energy
posted by  Ben Tucker  on 

Does anyone have any experience submitting for EAc2 as part of a Master Site? Our project is a campus project that will contain three buildings.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Oct 15, 2013, 8:48 pm

Biomass from energetic crops

CS-2009 EAc2:On-site Renewable Energy
posted by  BH .  on 

Hi, does LEED recognize the biomass from energetic crops such like: -short rotation coppice (Poplar and willow include) -Grasses and non-woody energy crops (Miscanthus and Hemps included) Tha

3
Default Avatar
LEEDuser Basic Member
52 thumbs up
Mon May 6, 2013, 3:19 pm

How many credit points does one get by offsetting 7%.

CS-2009 EAc2:On-site Renewable Energy
posted by  Tuana Papile  on 

By using on-site renewable energy for 7% of the total energy, do we get now 7 points compared to the 4 points for NC? Thank you

6
Thu Apr 4, 2013, 6:34 pm

CHP biofuel certifications

CS-2009 EAc2:On-site Renewable Energy
posted by  Marcello Polverino  on 

Hi LEED-User, I would like to know which documents I need to provide to the USGBC for a block heat and power plant fueled with biogas? Thanks Best wishes from Hanover (germany)

6
Fri Mar 15, 2013, 1:11 pm

Geothermal (Sometimes you're in, sometimes you're out!)

CS-2009 EAc2:On-site Renewable Energy
posted by  Katie Mesia  on 

We are in schematic design on a CS project. The project will have underground parking and will use piles as a foundation.

3
Regional Director of Sustainability
Gensler
LEEDuser Basic Member
2 thumbs up
Wed Oct 10, 2012, 2:05 pm

How to calculate %

CS-2009 EAc2:On-site Renewable Energy
posted by  Emmanuel Pauwels  on 

The reference for the calculation is total energy cost. The output of an array of PV panels is in kwh.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Sun Jul 29, 2012, 4:45 pm