Forum quick links
Min Chiller Efficiency
CS-2009 EAc1:Optimize Energy Performanceposted by Ciaran McCabe on
I am trying to establish the minimum chillier efficiency we are permitted to use in our PRM model. We have spec'd an air cooled chiller.
Tenant area-HVAC system type
CS-2009 EAc1:Optimize Energy Performanceposted by Amgad Khattab on
We are modeling a Core & Shell office building where the HVAC system is in the tenant scope. we are only delivering chilled water and outdoor air to the tenant areas.
ASHRAE 90.1 Add G table G3.1 baseline
CS-2009 EAc1:Optimize Energy Performanceposted by charles bell on
We have a building which is six stories. The first floor is retail, second thru fifth is office and sixth is residential. All are served from a virtual central plant.
Power Adjustment Percentages for Automatic Lighting Controls
CS-2009 EAc1:Optimize Energy Performanceposted by Ciaran McCabe on
Hi, I am producing an energy model for a a refurbished building with a new lighting scheme. The installed LPD is 9 Watts /m2 using LED.
Can a shell be LEED Core and Shell certified without HVAC?
CS-2009 EAc1:Optimize Energy Performanceposted by Lawrence Lile on
I've cross posted this in the LEED CS fundamental commissioning discussion since these two issues seem to be the showstoppers. We are working on a project that is a tenant finish-out shell.
MPR, GFA and energy modelling
CS-2009 EAc1:Optimize Energy Performanceposted by Puteri Shireen Jahnkassim on
Dear All, In the LEED MPR, it states that carpark areas cannot be part of the calculated GFA of a project submitting for LEED.
SHGC for the whole window or just glass?
CS-2009 EAc1:Optimize Energy Performanceposted by Marco Abdallah on
Hi, i am working on a WBS according to App. G. Regarding the fenestration of the baseline building the ASHRAE states an SHGC of 0.4 (climate zone 5).
Defining the building type
CS-2009 EAc1:Optimize Energy Performanceposted by Rosana Correa on
Hi, I have a 6 floors/2000 m² nonresidential building, and I am not sure about the system it should be. Area or number of floors is more relevant when choosing a system?
Cold C&S - No HVAC
CS-2009 EAc1:Optimize Energy Performanceposted by Scott Johnson on
We have a project that consists of a cold core and shell that will have warm lobby.
"Categorized as an Office Space"
CS-2009 EAc1:Optimize Energy Performanceposted by Aaron Frantz on
We are proposing a new mixed use multi-story to be submitted under NC, v2009. The first floor will be cold dark shell space for future retail/restaurant tenants.