COP - Future tenants - Energy Efficiency Simulation
CS-2009 EAp2:Minimum energy performanceposted by Marcio Alberto Casado Pereira on
Hi, It is possible to demand a future COP to comply with for future tenants and consider this value for the simulation (Eap2)? Thanks in advance.
Fan Power Limitation Pressure Drop Adjustment
CS-2009 EAp2:Minimum energy performanceposted by Yu Wang on
Hallo everyone, I am modeling a C&S project with 8 floors, and system 7 will be used in the Baseline Case.
Is it possible to design my building in parts?
CS-2009 EAp2:Minimum energy performanceposted by Ron Dean on
Hello!
Fan power calculations
CS-2009 EAp2:Minimum energy performanceposted by Eleni Soulti on
Hello, We have received a review from LEED saying that for the baseline model there are inconsistencies between the demand values reported in Table EAp2-5 and Table 1.4. When completing Table 1.4
Campus Site Lignting Calcs - again, sorry
CS-2009 EAp2:Minimum energy performanceposted by charles bell on
We submitted (on Jan 23, 2014) the question below. Unfortunately, since then my email has crashed and I have lost the response. Is there any way this can be recovered?
Mandatory provision 6.4.3.2 Setpoint Overlap Restriction
CS-2009 EAp2:Minimum energy performanceposted by Sandra Holmström on
Mandatory provision 6.4.3.2 Setpoint Overlap Restriction When heating and cooling to a zone is controlled by separate thermostatic controls shall heating setpoint exceed cooling setpoint. In our C&
Tenant agreement to exclude PFP boxes
CS-2009 EAp2:Minimum energy performanceposted by Rathnashree Bharadwaj on
In our project location, it is clear that no tenants will go for a heating system. The base building is also designed for cooling only.
Energy Modeling for a Group Certification
CS-2009 EAp2:Minimum energy performanceposted by Susan Di Giulio on
We are working on an open-air shopping mall with 6 buildings arranged around a main "street". Some are attached and some aren't.
U-factor for existing masonry wall
CS-2009 EAp2:Minimum energy performanceposted by Morteza Kasmaei on
Hello All In this LEED_CS project, the existing masonry wall was changed to the following configuration (from outside to inside): - glass-fiber-reinforced concrete panels [TAKTL] on galvanized st
campus energy - pieces of the pie
CS-2009 EAp2:Minimum energy performanceposted by charles bell on
On our campus AG projects, We have a central plant providing energy for 6 buildings. Only three of the buildings are LEED projects.