Electric meters for interior lighting and receptable loads

CS-2009 EAp2:Minimum Energy Performance
posted by  Toni Herena Montull  on 

Hi, In a Core and Shell model, for EAp2 (eQUEST), a LEED reviewer told me to define lighting and receptable loads meters.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Sep 9, 2014, 8:34 am

EAp2 Form

CS-2009 EAp2:Minimum Energy Performance
posted by  Lily Li  on 

in EAp2 Form Summary shows "N", but no error information provided, is this Form wrong?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Sep 5, 2014, 8:51 pm

Anticipated Tenant Fit Out

CS-2009 EAp2:Minimum Energy Performance
posted by  Paula Hernandez  on 

Background: In a C&S building we suggest a Tenant fit out to comply with credit IEQ_c8.2, where we show meeting rooms, corridors and an office space layout resulting in a grater quantity of peo

3
Thu Aug 28, 2014, 2:02 pm

DHW percentages for retail

CS-2009 EAp2:Minimum Energy Performance
posted by  Alfonzo Collins  on 

I am working on a model for a large retail space, and need to determine the hot water usage.

3
Wed Jul 23, 2014, 9:09 pm

Minimum threshold for projects with new areas and existing areas

CS-2009 EAp2:Minimum Energy Performance
posted by  MARCIO OROFINO  on 

We have a project which qualifies for CS and can be treated as a single building.

5
ENE Consultores
ENE CONSULTORES
LEEDuser Basic Member
11 thumbs up
Fri Jul 11, 2014, 3:21 pm

ASHRAE contradictory with local standards

CS-2009 EAp2:Minimum Energy Performance
posted by  BH .  on 

Hi, we have a project in a country where local requirements set high standards for legionella protection, thus there are high requirements regarding the water temperatures and water circulation.

3
Default Avatar
LEEDuser Basic Member
52 thumbs up
Tue Jun 24, 2014, 12:52 pm

Fan power calculations

CS-2009 EAp2:Minimum Energy Performance
posted by  Mark Stromberg  on 

I have a question regarding the pressure drop adjustments. We are doing energy modeling for a data center.

2
Tue Jun 10, 2014, 1:36 pm

DES Option 2

CS-2009 EAp2:Minimum Energy Performance
posted by  BH .  on 

We are dealing with the project served by DES.

9
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Jun 3, 2014, 3:14 pm

CW leaving Temperature reset

CS-2009 EAp2:Minimum Energy Performance
posted by  Dee Yun  on 

Hi, I am not sure about how to reset the CW leaving temperature in Baseline Case.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed May 28, 2014, 1:16 am

Extra Lighting Allowance for Tenanted Areas

CS-2009 EAp2:Minimum Energy Performance
posted by  Maya Karkour  on 

Dear All, I am modeling a retail C&S shopping mall, whereby the developer wants to give a lighting power allowance provision of 50 W/m2 for the retails shops.

3
Default Avatar
EcoConsulting
LEEDuser Basic Member
549 thumbs up
Tue May 27, 2014, 4:13 pm