EAp2 form issue on table 2-6
CS-2009 EAp2:Minimum energy performanceposted by charles bell on
Our project is a CS mixed use: hopefully this is not too general a question. We cannot get the table EAp2-6 to pull down results from the previous tables.
No cooling in Proposed Building
CS-2009 EAp2:Minimum energy performanceposted by Johannes Hopf on
Our proposed building has no cooling system installed; it is ventilated naturally. Now Appendix G says to model the proposed building like the baseline bldg system. That means with a VAV.
Tenant lighting exceeds ASHRAE, how to model?
CS-2009 EAp2:Minimum energy performanceposted by Aaron Yorke on
Hello all, In LEED - CS office projects, since the tenant fitout is unknown, LPD is modeled 12 W/m2 according ASHRAE. However, in the country we are working, national standart for LPD is 20 W/m2.
Thin Client
CS-2009 EAp2:Minimum energy performanceposted by Michela Tedeschi on
Hello all, The owners of the building we are certifying want to evaluate the effects of the thin client (form 150 W/computer to 50W/computer) on EAp2/EAc1.
Error in eQUEST in the Perform Compliance Analysis
CS-2009 EAp2:Minimum energy performanceposted by Toni Herena Montull on
Dear all, I am stuck with an error from eQUEST.
Historical Landmark
CS-2009 EAp2:Minimum energy performanceposted by Muge Karasahin on
We have a large scale international project in the eastern Europe.
Energy model for a version 4 project in a version 2009 project
CS-2009 EAp2:Minimum energy performanceposted by Mathilda Jonsson on
Hi all! We started up a LEED for CS version 4 project and got really good results for the energy model.
Problem with Fan Power input for System 6
CS-2009 EAp2:Minimum energy performanceposted by Morteza Kasmaei on
Dear Experts, I am straggling to input Fan Power in the baseline model (System 6 - Packaged VAV with PFP Boxes) and have the following issues: 1- In Table 1.4.6 - General HVAC, there is a note f
Required submittals of EAp2 contain same details
CS-2009 EAp2:Minimum energy performanceposted by tiantian zhou on
Dear sir/madam, For the submittal of credit EAp2, the revised Section 1 4 Tables have included all the input parmeters,should we still submit the input summary files?
questions about additional HVAC system in kitchen
CS-2009 EAp2:Minimum energy performanceposted by Zhang Peng on
Our project is a high rise building, which consists of offices, bank, dining area and so on. Now it is under the LEED V3 CS review.