Forum quick links
Precertification requirements
CS-2009 EAp2:Minimum Energy Performanceposted by František Bartoš on
Hi, is there some document that specifies precertification requirements for EAp2 (eventually for all prerequisites and credits in LEED CS 2009)? Thnaks for advice. Frank
lighting requirements
CS-2009 EAp2:Minimum Energy Performanceposted by Agnieszka Rylska on
And one more thing just to be sure: Does the project need to comply with lighting power allowance requirements of sections 9.5 or 9.6 (ASHRAE 90.1-2007)?
energy costs
CS-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
Sometimes in the energy bills a part of the costs doesn't depend on the energy that is used (e.g.
EUI for LEED projects
CS-2009 EAp2:Minimum Energy Performanceposted by Ron Dean on
Please, I would like to know where I can find the Energy Use Intensity (EUI) factors for LEED projects, according to their climate zone (per ASHRAE) and their activity.
SIMULATION METHOD
CS-2009 EAp2:Minimum Energy Performanceposted by RICARDO GUEMEZ DIAZ on
HI, IM RICARDO GUEMEZ FROM MEXICO CITY, I AM IN THE PROCESS OF SIMULATING A WAREHOUSE FOR TENANT LEASING, THE OWNER IN ALL PROJECTS ONLY INCLUDE NATUARAL VENTILATION WITH IEQ-01 COMPLIANCE.
Attached building
CS-2009 EAp2:Minimum Energy Performanceposted by Therese Malm on
There is an attached building to the building we simulate. Should thiis attached building be simulated in the proposed and baseline building or should it be exluded?
High Process Load and Equipment Efficiency
CS-2009 EAp2:Minimum Energy Performanceposted by Shad Traylor on
Our project is a manufacturing plant which is seeking certification under NC Core and Shell v2009.
Mandatory provisions of Closed-circuit cooling towers
CS-2009 EAp2:Minimum Energy Performanceposted by Florinda Garcia on
My project is in the process of the LEED CS 2009 certification.
Base Case vs Project Case
CS-2009 EAp2:Minimum Energy Performanceposted by Dana Guzman on
Hi, can you kindly clarify whether the glazing percentage and floor area for the base case needs to match the project case when reviewing compliance for EAp2?