Problem with Fan Power input for System 6
CS-2009 EAp2:Minimum Energy Performanceposted by Morteza Kasmaei on
Dear Experts, I am straggling to input Fan Power in the baseline model (System 6 - Packaged VAV with PFP Boxes) and have the following issues: 1- In Table 1.4.6 - General HVAC, there is a note f
Required submittals of EAp2 contain same details
CS-2009 EAp2:Minimum Energy Performanceposted by tiantian zhou on
Dear sir/madam, For the submittal of credit EAp2, the revised Section 1 4 Tables have included all the input parmeters,should we still submit the input summary files?
questions about additional HVAC system in kitchen
CS-2009 EAp2:Minimum Energy Performanceposted by Zhang Peng on
Our project is a high rise building, which consists of offices, bank, dining area and so on. Now it is under the LEED V3 CS review.
baseline HVAC system selection
CS-2009 EAp2:Minimum Energy Performanceposted by Agnieszka Rylska on
I would like to clarify the basis of baseline HVAC system selection in energy modeling. Selection is based, among others, on number of floors and conditioned floor area.
Lighting Power Density requirement for Tenant spaces
CS-2009 EAp2:Minimum Energy Performanceposted by Pedro Urazan on
Hi, Is it required that the Tenants comply in their lighting designs with the Lighting Power Density requirement of ASHRAE 90.1 2007?
Modified Prerequisite
CS-2009 EAp2:Minimum Energy Performanceposted by TOMAS URIBE on
Hello Markus. We are planing to use LEED-CS Revised points thresholds based in Owner Energy percentage.
No cooling in Proposed Building
CS-2009 EAp2:Minimum Energy Performanceposted by Johannes Hopf on
Our proposed building has no cooling system installed; it is ventilated naturally. Now Appendix G says to model the proposed building like the baseline bldg system. That means with a VAV.
Tenant lighting exceeds ASHRAE, how to model?
CS-2009 EAp2:Minimum Energy Performanceposted by Aaron Yorke on
Hello all, In LEED - CS office projects, since the tenant fitout is unknown, LPD is modeled 12 W/m2 according ASHRAE. However, in the country we are working, national standart for LPD is 20 W/m2.
Thin Client
CS-2009 EAp2:Minimum Energy Performanceposted by FABIO VIERO on
Hello all, The owners of the building we are certifying want to evaluate the effects of the thin client (form 150 W/computer to 50W/computer) on EAp2/EAc1.
Error in eQUEST in the Perform Compliance Analysis
CS-2009 EAp2:Minimum Energy Performanceposted by Toni Herena Montull on
Dear all, I am stuck with an error from eQUEST.