Forum quick links
Project with mix of New Construction and Alterations
posted by Kent B on
The project is an elementary school project with four buildings on the site.
1) Building A: main elementary building. Building is being fully replaced.
V5: requirements for EPDs
NC-v4.1 MRc2:Environmental Product Declarationsposted by Gary Soe on
Hi all,
LEED v4.0 Energy Model: How to Handle Unknown (Central Plant) Equipment Data for Tenant Fit-Out?
CI-v4 EAc2:Optimize energy performanceposted by on
I’m working as an energy modeler on a 3‑floor office fit‑out within a 42‑story building in New York City (LEED v4.0).
Integrative Analysis of Building Materials
Pilot-Credits MRpc103:Integrative Analysis of Building Materialsposted by on
The project team is pursuing this pilot credit after achieving BPDO EPD and HPD credits.
Easily Achievable Where Mandates are in Place
Pilot-Credits SSpc129:Comprehensive Compostingposted by Marsha Gentile on
This pilot credit is easily achievable where mandates and infrastructure (by municipality and/or base building in case of CI project) are in place.
Staff-Only Collection in Hotel Guest Floors
Hospitality-NC-v4 MRp1:Storage and collection of recyclablesposted by Amgad Khattab on
We are pursuing LEED BD+C: Hospitality certification and have a question regarding the Storage and Collection of Recyclables prerequisite.
LEEDv4 BD&C: Warehouse and Distribution Centers
posted by Summer Gorder on
We are working with the City of Portland on a renovation of a mostly warehouse building to have a a large maintenance garage for their city fleet cars and trucks, which occupies the majority of the
Baseline Pumping Power
NC-2009 EAp2:Minimum Energy Performanceposted by Ahmed Labeeb on
Based on ASHRAE 90.1, the chilled water pumping power must be 22 W/gpm and does not mention the effect of pumps' head.