Forum quick links
CI minimum scope of work?
posted by Michael Smithing on
Is there a minimum scope of work to certify a project under LEED CI?
performance period for re-certification
EBOM-2009 MRc1:Sustainable purchasing - ongoing consumablesposted by Pablo Fortunato Suarez on
The LEED Re-certification Guidance document recommends submission of purchases of the most recent 25% of performance period. Are we allowed to include data prior to that period as well?
tools
Pilot-Credits MRpc63:Whole building life cycle assessmentposted by Emmanuel Pauwels on
Is one click LCA an accepted tool to demonstrate compliance with this credit?
Two buildings on one project site
CS-2009 IEQp1:Minimum indoor air quality performanceposted by James Lee on
Hi, I am James and am working on project with two buildings on one project site. In this case, should I fill out IEQp1 form separately like EAp2? Maybe someone already asked this question. But p
Option 2 Meaning of "Contiguous Area"
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Daniel Smith on
Some of the air handling units at the site (police station) where I will be conducting air testing serve more than one area on a given floor, and these areas are not directly connected to each othe
waste audit documentation
EBOM-2009 MRc6:Solid waste management - waste stream auditposted by Fareed Alghimlas on
we are working on performing a daily waste audit for the building, my question is : do we document the outcomes of just one day of the waste audit during the performance period?
fixture group for toilet in a private office
EBOM-2009 WEp1:Minimum indoor plumbing fixture and fitting efficiencyposted by Pablo Fortunato Suarez on
The project (office building) has a few private (executive) offices which have their own assigned private toilet. This is intended for use only by the assigned executive.
pantry sinks
EBOM-2009 WEp1:Minimum indoor plumbing fixture and fitting efficiencyposted by Pablo Fortunato Suarez on
Is there a guideline for pantry sinks in office spaces?
Demolished Irrigation System
NC-2009 WEc1:Water efficient landscapingposted by Gregory Martin on
I am working on a renovation project on a college campus that has made efforts to be more sustainable.
Organic Fertilizer
EBOM-2009 SSc3:Integrated pest management, erosion control, and landscape management planposted by Andy Rhoades on
My landscaper is using a 100% Natural Organic component fertilizer with a ratio of 3-3-2.