Appropriate Waste Categories

EBOM-2009 MRc6: Solid waste management - waste stream audit
posted by Paul C on Nov 5, 2010, 12:54 pm

I want to make sure what I have is adequate before performing my waste stream audit. On page 301 of the reference guide at the bottom of the page it states "Consider at a MINIMUM, using the...

Last reply: Jason Franken, Nov 8, 2010, 10:39 am

Option 2- Server cooling

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Christian Brücher on Nov 8, 2010, 9:26 am

In our CI-project (2 floors of office space) we want to go for option 2. But we are not sure if we have to include the installed load for cooling the server room into the the total tenant space...

Last reply: Paul Conrad, Nov 8, 2010, 10:36 am

Option 1 Equipment Efficiency- more questions

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Nancy Henderson on Nov 4, 2010, 6:03 pm

We have two project pursuing the prescriptive option and each one has issues:

1. A tenant is taking all of an existing buildng and adding a VRF system to supplement the existing system (...

Last reply: Paul Conrad, Nov 8, 2010, 10:34 am

Separation of Recycling Streams

EBOM-2009 MRc7: Solid waste management - ongoing consumables
posted by Adolfo Silva on Apr 14, 2010, 11:18 am

My question is in regards to the level of detailed required for this credit. Most offices collect commingled recyclables such as glass, plastic and aluminum cans; essentially single-use drink...

Last reply: Dan Ackerstein, Nov 8, 2010, 10:17 am

Help with review comments

EBOM-2009 IEQc3.3: Green cleaning - purchase of sustainable cleaning products and materials
posted by Yong Lee Low on Aug 8, 2010, 5:14 am

Our project has been reviewd and following is the comment from USGBC
"Please provide documentation from manufacturers or suppliers that verifies product compliance with the specified...

Last reply: Jason Franken, Nov 8, 2010, 10:09 am

IEQc8.2 limitations on number of vision panels?

NC-2009 IEQc8.2: Daylight and views - views
posted by Matt Napolitan on Nov 4, 2010, 2:21 pm

Is there a limitation on how many vision panels one may look through to attain their views? If all other criteria are met e.g. glazing size, etc, can someone who looks through 3 or 4 separate...

Last reply: Diaa Madkour, Nov 8, 2010, 8:30 am

interior light fixtures by the tenant

CS-2009 SSc8: Light Pollution Reduction
posted by Daniela Corcuera on Nov 6, 2010, 5:59 pm

If interior light fixtures will be installed by the tenant, would still be possible to achieve this credit, considering only exterior lighting?

Is COMCheck an approved software for LEED purposes?

NC-2009 EAc1: Optimize Energy Performance
posted by Shannon Deeb on Nov 5, 2010, 12:12 pm

I see COMCheck listed in some of the links above but when I clicked the DOE Approved software link COM-Check doesn't appear on the list.

Last reply: Barbara McCrary, Nov 5, 2010, 12:29 pm

Vendor invoice?

NC-2009 MRc7: Certified Wood
posted by Deborah Spira on Nov 4, 2010, 9:00 am

Hi,
Can you please help me understand the chain-of-custody requirement. For example, my subcontractor of windows can garantee that the...

Last reply: Nathan Benjamin, Nov 4, 2010, 6:29 pm

LEED EBOM for Building Less Than 5,000 SF

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Peter Keithly on Oct 18, 2010, 12:22 pm

We are working on a LEED...

Last reply: Peter Keithly, Nov 4, 2010, 5:39 pm