Appropriate Waste CategoriesEBOM-2009 MRc6: Solid waste management - waste stream auditposted by Paul C on Nov 5, 2010, 12:54 pm
I want to make sure what I have is adequate before performing my waste stream audit. On page 301 of the reference guide at the bottom of the page it states "Consider at a MINIMUM, using the... Last reply: Jason Franken, Nov 8, 2010, 10:39 am |
|
Option 2- Server coolingCI-2009 EAc1.3: Optimize energy performance - HVACposted by Christian Brücher on Nov 8, 2010, 9:26 am
In our CI-project (2 floors of office space) we want to go for option 2. But we are not sure if we have to include the installed load for cooling the server room into the the total tenant space... Last reply: Paul Conrad, Nov 8, 2010, 10:36 am |
|
Option 1 Equipment Efficiency- more questionsCI-2009 EAc1.3: Optimize energy performance - HVACposted by Nancy Henderson on Nov 4, 2010, 6:03 pm
We have two project pursuing the prescriptive option and each one has issues: 1. A tenant is taking all of an existing buildng and adding a VRF system to supplement the existing system (... Last reply: Paul Conrad, Nov 8, 2010, 10:34 am |
|
Separation of Recycling StreamsEBOM-2009 MRc7: Solid waste management - ongoing consumablesposted by Adolfo Silva on Apr 14, 2010, 11:18 am
My question is in regards to the level of detailed required for this credit. Most offices collect commingled recyclables such as glass, plastic and aluminum cans; essentially single-use drink... Last reply: Dan Ackerstein, Nov 8, 2010, 10:17 am |
|
Help with review commentsEBOM-2009 IEQc3.3: Green cleaning - purchase of sustainable cleaning products and materialsposted by Yong Lee Low on Aug 8, 2010, 5:14 am
Our project has been reviewd and following is the comment from USGBC Last reply: Jason Franken, Nov 8, 2010, 10:09 am |
|
IEQc8.2 limitations on number of vision panels?NC-2009 IEQc8.2: Daylight and views - viewsposted by Matt Napolitan on Nov 4, 2010, 2:21 pm
Is there a limitation on how many vision panels one may look through to attain their views? If all other criteria are met e.g. glazing size, etc, can someone who looks through 3 or 4 separate... Last reply: Diaa Madkour, Nov 8, 2010, 8:30 am |
|
interior light fixtures by the tenantCS-2009 SSc8: Light Pollution Reductionposted by Daniela Corcuera on Nov 6, 2010, 5:59 pm
If interior light fixtures will be installed by the tenant, would still be possible to achieve this credit, considering only exterior lighting? |
|
Is COMCheck an approved software for LEED purposes?NC-2009 EAc1: Optimize Energy Performanceposted by Shannon Deeb on Nov 5, 2010, 12:12 pm
I see COMCheck listed in some of the links above but when I clicked the DOE Approved software link COM-Check doesn't appear on the list. Last reply: Barbara McCrary, Nov 5, 2010, 12:29 pm |
|
Vendor invoice?NC-2009 MRc7: Certified Woodposted by Deborah Spira on Nov 4, 2010, 9:00 am
Hi, Last reply: Nathan Benjamin, Nov 4, 2010, 6:29 pm |
|
LEED EBOM for Building Less Than 5,000 SFEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Peter Keithly on Oct 18, 2010, 12:22 pm
We are working on a LEED... Last reply: Peter Keithly, Nov 4, 2010, 5:39 pm |