Preferred file format for plan uploads- PIF4

General forums
posted by Lew Bonadies on May 11, 2011, 6:56 pm

When uploading floor plans, site plans, elevations etc. are pdf files the accepted format, or can we use the new Autodesk Design Review dwf file format? Like Adobe, Autodesk offers a free reader...

Last reply: David Posada, May 11, 2011, 7:34 pm

Air Speed Control

Schools-2009 IEQc6.2: Controllability of systems - thermal comfort
posted by Erik Bergstrom on Jun 8, 2010, 11:31 am

Is a ceiling fan with individual control considered a thermal comfort control under IEQ6.1 for a multi-occupant space? (air speed)

Last reply: SERA Architects, May 11, 2011, 5:18 pm

Central Plant Question

NC-2009 EAc4: Enhanced Refrigerant Management
posted by Lauren Sparandara on May 6, 2011, 2:49 pm

Scenario: Campus new construction projects which are connecting to an existing central plant for heating and cooling. The reference guide and...

Last reply: Lauren Sparandara, May 11, 2011, 2:45 pm

Is Sealing off 'unused' Door acceptable to meet Requirements?

EBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Lori Winneshiek on May 2, 2011, 10:29 am

We have a building that used to be muti-tenanted to a far greater extent than it is now and has many unused doors that once acted as dedicated entrances to a number of small suites but no longer...

Last reply: Dan Ackerstein, May 11, 2011, 12:42 pm

Post-review changes to the performance period

Performance Period
posted by Melissa Young on Apr 25, 2011, 9:36 am

We submitted our preliminary application for LEED 2009...

Last reply: Dan Ackerstein, May 11, 2011, 12:36 pm

Increase in FTE during performance period

Performance Period
posted by Matthew Perna on Apr 25, 2011, 2:50 pm

The top floor of our 4 story building was fit out and rented toward the end of our performance period (it was...

Last reply: Dan Ackerstein, May 11, 2011, 12:33 pm

Retaining rainwater for future uses

CS-2009 SSc6.1: Stormwater design - quantity control
posted by Gabriela Hernández Castillo on Mar 23, 2011, 4:24 pm

Will capturing all rainwater and keep it in a tank for future uses such as cooling towers and irrigation? Our project will not infiltrate it but...

Last reply: Gabriela Hernández Castillo, May 11, 2011, 12:30 pm

62MZ Calculation for IEQ2- For VAV Systems

Schools-2009 IEQc2: Increased Ventilation
posted by Laura Long on Nov 24, 2010, 4:19 pm

The LEED Reference Guide only addresses the increased ventilation calculation at the zone level, not the system level. I understand that the outdoor air supplied to each zone needs to be...

Last reply: Julia Weatherby, May 11, 2011, 9:58 am

specific mechanical drawings for PI4?

General forums
posted by Erica Downs on Apr 4, 2011, 2:59 pm

Does anyone know specifically which "mechanical" drawings...

Last reply: Kimberly Frith, May 11, 2011, 9:12 am

Increase Ventilation- Corridor

CI-2009 IEQc2: Increased Ventilation
posted by Simon Sue on May 10, 2011, 2:32 am

Hi,
we intend to attempt this credit, but come across on our design that we does not have any dedicated FCU serving on this corridor. the corridor is a simple walkway for employees walk...

Last reply: David Hubka, May 10, 2011, 2:48 pm