Topic | Recent |
---|---|
why do we need to model heating if we have noneNC-2009 EAp2: Minimum Energy Performanceposted by Alicia Villanueva on Jul 9, 2011, 6:56 am
I am working in projects in Mexico and it has been a challenge to model heating when we have none. Sometime when modeling heating comes out higher in the proposed design than in the... Last reply: thomas beal, Jul 19, 2011, 2:00 pm |
|
Simulation Software-EnergyPlusNC-2009 IEQc8.1: Daylight and views - daylightposted by Hsin-Yi Hsieh on Jun 2, 2011, 5:08 pm
Can EnergyPlus be used to simulate daylighting for this credit? From my understanding, the clear-sky daylight factors are calculated for sun positions in EnergyPlus. You can put a... Last reply: Sadie Martin, Jul 19, 2011, 1:57 pm |
|
Zoning vs. room-by-room & spreadsheetNC-2009 IEQc8.1: Daylight and views - daylightposted by Johannes Gellrich on Jun 24, 2011, 4:08 am
We are using IES VE to show compliance with EA P2 and IEQ C8.1. For EA P2 we combined spaces with similar schedules to zones, separated by orientation. Because we use just one model, the daylight... Last reply: Sadie Martin, Jul 19, 2011, 1:51 pm |
|
Recommendations for Wireless Automatic ReadingsEBOM-2009 WEc1: Water Performance Measurementposted by Jenny Carney on Jul 19, 2011, 12:51 pm
Hi All, For those who have meters in hard to reach vaults, I'm wondering if you've found equipment you like for taking remote readings on water meters? Thanks, Last reply: Barry Giles, Jul 19, 2011, 1:06 pm |
|
Interior Lighting Compliance for a Restaurant Tenant?CS-2009 SSc8: Light Pollution Reductionposted by Julie Hendricks on Jul 19, 2011, 12:45 pm
I have a project that is an office building with mixed retail on the first floor, including at least one restaurant. The restaurant hours will likely extend beyond the 11 pm time past which we... |
|
SSc4.4 in a Residential Scenario and the carpool/vanpool reqs.NC-2009 SSc4.4: Alternative transportation - parking capacityposted by Sonia M. Miranda Palacios on May 6, 2011, 10:14 am
I´m working in a residential project that will have less than the parking spaces required by code and I would like to opt for this credit. Does anyone has an idea of what does "provide... Last reply: David Posada, Jul 19, 2011, 12:43 pm |
|
energy modelingCI-2009 EAp2: Minimum Energy Performanceposted by Christine Teichert on Jul 19, 2011, 10:50 am
Does CI certification require energy modeling for silver certification? |
|
Hevea brasiliensisSchools-2009 MRc6: Rapidly Renewable Materialsposted by MAUDE PINTAL on Jul 18, 2011, 2:19 pm
Hello, Last reply: MAUDE PINTAL, Jul 19, 2011, 10:03 am |
|
MPR 3.General forumsposted by javier bolanos zeledon on Jun 7, 2011, 8:48 pm
According to MPR 3 , 1. "The LEED project boundary must include all contiguous land that is associated with and supports normal building operations for the LEED project building, including all... Last reply: KC Kurtz, Jul 19, 2011, 7:41 am |
|
LEED online formNC-2009 EAp2: Minimum Energy Performanceposted by Barbara McCrary on Jul 18, 2011, 12:02 pm
I am assigned to fill out the LEED online form for EAp2: Minimum Energy Performance. Section 1.1B - Mandatory Requirements requires signature (via initials) by the Architect and Electrical... Last reply: Chaan Ah Bahk, Jul 19, 2011, 4:07 am |