Topic | Recent |
---|---|
Retail- commercial interiorsCI-2009 SSc3.3: Alternative transportation - parking availabilityposted by eileen hughes on Jul 22, 2011, 5:04 pm
There is existing parking but no DESIGNATED parking will be provided for Tenant employees. Last reply: Larry Jones, Aug 10, 2011, 5:09 pm |
|
Protfolio Manager AnalysisEBOM-2009 EAc1: Optimize Energy Efficiency Performanceposted by Paola Figueiredo, Newton Figueiredo on Aug 4, 2011, 3:34 pm
We are working on projects for LEED EBO&M and have some doubts related to the credits EApre1& EAc1. The Portfolio Manager Analysis is unable to classify the energy consumption of the... Last reply: Alexa Stone, Aug 10, 2011, 5:08 pm |
|
EAp2 Case 2B FulfillmentEBOM-2009 EAc1: Optimize Energy Efficiency Performanceposted by Jessica Bruscato on Aug 10, 2011, 12:23 pm
Being that my project is a convention center, it does not qualify for energy star. Therefore, I am using the EAp2 Case 2 offline calculator in conjunction with the EPA portfolio manager tool... Last reply: Alexa Stone, Aug 10, 2011, 5:03 pm |
|
Is the pdf version available the correct document for this draftGeneral forumsposted by Bill Swanson on Aug 3, 2011, 3:07 pm
I had commented on the Credit about mercury content in lamps. The response I got said, "...The Reduced Mercury in Lamps credit is no longer a stand alone credit, the Technical Advisory Group is... Last reply: Bill Swanson, Aug 10, 2011, 3:33 pm |
|
LEED-HEALTH CARE registrationGeneral forumsposted by Joshua ADY on May 25, 2011, 2:25 am
We have a psychiatric hospital project in UAE intending to get certified under LEED for Health Care. As we now see from USGBC website that LEED-HC V2009 is released although there are still... Last reply: Veronika Sundberg, Aug 10, 2011, 2:58 pm |
|
Timing of Installation of FixturesCI-2009 WEp1: Water Use Reductionposted by Dax Ponce de Leon on Jul 14, 2011, 12:20 pm
Do fixtures need to be installed prior to occupancy? Prior to project completion? Last reply: Dax Ponce de Leon, Aug 10, 2011, 7:37 am |
|
service energyNC-2009 EAc1: Optimize Energy Performanceposted by Emmanuel Pauwels on Aug 6, 2010, 8:46 am
In the LEED Letter Template, there are detailed rows to fill out energy consumption for different types of equipment that all can be categorized as "service energy" Is it allowed to fill out just... Last reply: Nowfal Kunju Muhammed, Aug 10, 2011, 2:30 am |
|
Maintenance Staff TrainingEBOM-2009 WEc4: Cooling Tower Water Managementposted by David Hubka on Jun 2, 2011, 11:14 am
LEED User offers the following advice for projects that completely outsource their cooling tower management: Last reply: SIG - Sustainability Main Account, Aug 9, 2011, 4:53 pm |
|
light controls for exam roomsGeneral forumsposted by Susan Walter on Aug 9, 2011, 3:38 pm
Elizabeth, The light controls are typically for workers and include patients when they will be there for a long time. So, if your exam rooms are dialysis or chemo patients then having control... |
|
Improper Product ClaimsNC-2009 MRc4: Recycled Contentposted by Eric Shamp on Feb 28, 2011, 7:18 pm
I have sort of a minor ethical crisis: I'm reviewing the website of a not-to-be-named tile manufacturer who is claiming 40% MRc4... Last reply: Paola Figueiredo, Newton Figueiredo, Aug 9, 2011, 12:18 pm |