Topic | Recent |
---|---|
LEED for Schools, or LEED NC?General forumsposted by Maya Karkour on Jun 30, 2011, 3:26 amTristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11470 thumbs up September 23, 2011- 1:13 pm George, please post this question under our rating system selection forum. You can find the link to that forum on this page: http://www.leeduser.com/node/add/forum Log in or register to post comments ... Last reply: Tristan Roberts, Sep 23, 2011, 1:13 pm |
|
Meeting humidity requirements with mixed modeNC-2009 IEQc7.1: Thermal comfort - designposted by Carly Ruggieri on Aug 16, 2011, 10:42 am
Does anyone have any experience or guidance for documenting compliance with ASHRAE 55 with a mechanically conditioned, naturally ventilated building? When windows are open, the required humidity... Last reply: Patrik Lazzari, Sep 23, 2011, 11:49 am |
|
Help needed: Process Energy / Water- 25% Default vs. ActualNC-2009 EAc1: Optimize Energy Performanceposted by Dan Prows on Feb 10, 2010, 4:09 pm
We have a child care center in the SE US. We did very well on envelope, lighting, and mechanical design (53% reduction in those areas). The building has a commercial kitchen with several... Last reply: Marcus Sheffer, Sep 23, 2011, 9:23 am |
|
Private lavatory faucetCI-2009 WEp1: Water Use Reductionposted by Sundararaj Subburaman on Jun 17, 2011, 2:29 am
Hi, We have a project that consists of an office space, a laboratory, and a salon area for testing health care products. Kindly advice if the water fixtures in the salon area has to be... Last reply: Sundararaj Subburaman, Sep 23, 2011, 1:05 am |
|
Required Signatory- ContractorNC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by jacque decker on Sep 22, 2011, 5:56 pm
Hi, Last reply: Nadav T. Malin, Sep 22, 2011, 7:49 pm |
|
check with GBCIGeneral forumsposted by Tristan Roberts on Sep 22, 2011, 3:24 pm
Brian, I am not familiar with how to deal with this issue. From what I know about LEED Online, you may have to send new invites or even start over at an earlier point. I would check with... Last reply: Brian Wolfe, Sep 22, 2011, 6:12 pm |
|
calculating solar / mechanical square footageNC-2009 SSc7.2: Heat island effect - roofposted by Gita Nandan on Jan 5, 2011, 12:38 pm
in calculating the 50% area of a roof to be installed with a green roof for this credit, one can deduct the mechanical area and area covered by solar systems. in our project, our solar array is... Last reply: Michelle Teague, Sep 22, 2011, 6:11 pm |
|
LEED and ErgonomicsPilot-Credits EQpc44: Ergonomics approach for computer usersposted by Linda Miller on Sep 22, 2011, 4:47 pm
Seeking your Input: Does your organization have a policy pertaining to Leadership in Energy and Environmental Design (LEED)? This study may be for you, we are examining how ergonomics is... |
|
Garage and technical roomsNC-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by BH . on Aug 30, 2011, 10:01 am
Hello, We are dealing with project with underground garage, where adjacent spaces are technical rooms. Can we transfer the air from the garage to the technical rooms to ventilate them? Do... Last reply: Dylan Connelly, Sep 22, 2011, 3:01 pm |
|
Option 1: Full Flush-out Before Occupancy- Is there a Min. CF?CI-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Michelle Bracewell-Musson on Aug 4, 2011, 10:50 am
With Option 1, Path 1, we are expected to flush-out 14,000 cf/sf of outdoor air at 60 degrees temp. and 60% humidity min. Is there a minimum ventilation rate as with Path 2 which is 0.30 cf/min... Last reply: Dylan Connelly, Sep 22, 2011, 11:37 am |