Error Message when trying to select CompleteEBOM-2009 WEc1: Water Performance Measurementposted by Cynthia Fowler on Mar 31, 2011, 8:36 am
I get the following message when I try to click "Complete" for the credit: Last reply: Barry Giles, Mar 31, 2011, 10:54 pm |
|
Old and Tankless Toilets have NO label of Flow RatesNC-2009 WEp1: Water Use Reductionposted by university hall on Mar 31, 2011, 2:36 pm
We are working on a University Administrative Building where the toilet fixtures are old, connected to the wall, without a tank, and have no labels of flow rates. How do we measure the flow rate... Last reply: David Posada, Mar 31, 2011, 8:49 pm |
|
BAS Lighting ControlsEBOM-2009 EAc3.1: Performance measurement - building automation systemposted by Nell Boyle on Jun 14, 2010, 2:04 pm
What level of lighting controls are acceptable for LEED? Do a certain percent of building lights have to be controlled by the BAS or is there some other measure? Maybe this requirement could be... Last reply: Kimberly Frith, Mar 31, 2011, 2:32 pm |
|
Must have VAV system for Option 1?CI-2009 EAc1.3: Optimize energy performance - HVACposted by Dave Intner on Feb 8, 2010, 5:30 pm
When we look into the LEED Reference Guide for Option 1, it seems to require a... Last reply: Paul Conrad, Mar 31, 2011, 10:25 am |
|
Enhanced CX 'Design Firm'NC-2009 EAc3: Enhanced Commissioningposted by Julianne Laue on Feb 18, 2011, 12:03 pm
If a firm is a AE firm and are signing the arch drawings, but not involved in MEP...can an engineer in the firm be the CX? Last reply: Keith Steurer, Mar 30, 2011, 4:20 pm |
|
STC ratings for ceiling and floors?Schools-2009 IEQp3: Minimum Acoustical Performanceposted by Tyler Barter on Mar 30, 2011, 9:16 am
hi, Last reply: Daniel Hicks, Mar 30, 2011, 3:20 pm |
|
Use CO2 Measurement to meet Prereq RequirementEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Eric Tu on Mar 29, 2011, 2:55 pm
Hello; Out BAS does not measure air flow (CFM), but, it does measure Return Air and OA C02 values. Can this PreReq be met using... Last reply: David Hubka, Mar 30, 2011, 1:51 pm |
|
Separate Trash & Recycling AuditsEBOM-2009 MRc6: Solid waste management - waste stream auditposted by Alexis Thompson on Mar 30, 2011, 1:31 pm
If a project has 2 separate haulers (one for trash, and one for recycling), then is it necessary to conduct both audits at the same time? Will the credit be denied/pending if the trash audit was... Last reply: Jason Franken, Mar 30, 2011, 1:50 pm |
|
Bike storage for residents with disabilities?NC-2009 SSc4.2: Alternative transportation - bicycle storage and changing roomsposted by Stefania Minotti on Mar 22, 2011, 9:53 am
I’m presently working on a mid-rise residential social housing building with 5 stories and 76 units. 67 of these apartments are 1 bedroom and 9 are two bedroom. According to the guide I need to... Last reply: Jonathan Weiss, Mar 30, 2011, 1:25 pm |
|
SamplingPilot-Credits PC36: Compartmentalizationposted by Aaron Gary on Mar 29, 2011, 7:07 pm
If a multifamily project (based on Green Rater/Builder experience) is approved for sampling by the USGBC will sampling be allowable for achieving this credit as well or will every unit have to be... Last reply: Asa Foss, Mar 30, 2011, 9:30 am |