LEED Certification for Phase wise constructionGeneral forumsposted by Ramesh Narayanan on Aug 29, 2011, 6:33 amNadav Malin CEO BuildingGreen, Inc. LEEDuser Moderator 844 thumbs up August 29, 2011- 10:06 am I've responded to this question in the MRc4 forum. Please continue the conversation there. Log in or register to post comments ... Last reply: Nadav Malin, Aug 29, 2011, 10:06 am |
|
Development footprint exceeding previously developedGeneral forumsposted by Ricardo Sobral on Aug 28, 2011, 8:11 am
LTprerequisite1- Case 1- What happens is the new development footprint exceeds the previously developed portions of the site? |
|
% of annual rainfall treated?NC-2009 SSc6.2: Stormwater design - quality controlposted by Kash Boodjeh on Aug 22, 2011, 3:06 pm
The reference guide states that "90% of the avg annual rainfall is equivalent to treating the runoff from 1" of rainfall for a... Last reply: Gregory Hurst, Aug 26, 2011, 6:09 pm |
|
Parking Lighting not through Building Elect ServiceNC-2009 SSc8: Light Pollution Reductionposted by Michelle Rosenberger on Aug 26, 2011, 4:56 pm
My project puts a new community center on an existing masterplanned campus. My LEED boundary includes new and relocated parking that serve the new building and are part of my project team's scope... |
|
LEED CS 2009 LEED ENERGY MODELCS-2009 EAc1: Optimize Energy Performanceposted by John Harrington on Aug 24, 2011, 5:14 pm
My proposed system is a WSHP. However, the heat from electric exceeds the heat used from boiler in the WSHP loop. I would condiser the primary heating source in this building to be... Last reply: John Harrington, Aug 26, 2011, 4:45 pm |
|
ASHRAE/eQuest question- external blinds and SHGC requirementCS-2009 EAc1: Optimize Energy Performanceposted by Agnes Vorbrodt on Jul 17, 2011, 12:09 pm
Hello, Last reply: Marcus Sheffer, Aug 26, 2011, 3:14 pm |
|
Can 10' requirement be met by a combination of mats?Schools-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Renee Shirey on Aug 26, 2011, 2:58 pm
Due to space constraints, our vestibules were not able to be a full 10' wide between our doors, thus the recessed walkoff mats aren't 10'. Does anyone see any issue with supplimenting the... Last reply: Allison Beer McKenzie, Aug 26, 2011, 3:03 pm |
|
Peak Demand Reduction Credit NOT Demand ResponsePilot-Credits EApc8: Demand responseposted by Debra Lombard on Aug 26, 2011, 1:15 pm
HI Everyone, I am working on a LEED-NC v2.2 project which is small but has three technologies that reduce... |
|
Accumulating AnnexesLiving with LEED Online - quirks, bugs and hiccupsposted by Paola Figueiredo, Newton Figueiredo on Aug 26, 2011, 1:08 pm
The credits seem to be accumulating annexes, for example, after uploading an annex in the templates for the SS 4.1 credit, it appears later in the following credits as an upload, even for... |
|
Secret LeaseCI-2009 MRc1.1: Tenant space - long-term commitmentposted by David Edenburn on Jul 19, 2011, 11:25 pm
In MR c1.1 and in other credits LEED asks for a (redacted) copy of the lease for term, utility payments, etc. In our case we have been told that the entire lease is confidential and cannot be... Last reply: Nadav Malin, Aug 26, 2011, 12:41 pm |