EAc1 forumGeneral forumsposted by Tristan Roberts on Aug 10, 2010, 7:39 pm
Thomas, my understanding is that the 2007 version of ASHRAE 90.1 is tougher than the 2004 version, so you may not be as successful here. I don't have much experience to offer, though. I would... |
|
What should be shown andEBOM-2009 SSc2: Building Exterior and Hardscape Management Planposted by Kevin Kelly on Jul 20, 2010, 10:55 am
What should be shown and highlighted in the site plan that needs to be posted for this credit? Can and should the same site plan be used for all sustainable sites credits? Last reply: Jason Franken, Aug 10, 2010, 5:08 pm |
|
EBOM 2009 IEQc3.2 Room types and square footageEBOM-2009 IEQc3.2: Green cleaning - custodial effectiveness assessmentposted by Lee Burns on Aug 9, 2010, 5:51 pm
I have about one million square feet of commercial office space that obviously includes mail rooms, entries, break rooms, small conference rooms, rest rooms, elevators, etc. Do I really need to... Last reply: Allison Beer McKenzie, Aug 10, 2010, 12:45 pm |
|
Re: Additional Building Added in Middle of ProjectGeneral forumsposted by David Posada on Aug 9, 2010, 8:50 pm
You may possibly be able to exclude this second building from the certifcation scope, but you'll want to look carefully at the MPR Supplemental Guidance document for MPR # 3, Site Boundary on... Last reply: Tristan Roberts, Aug 10, 2010, 12:32 pm |
|
Help with Interpretation!CI-2009 EAp3: Fundamental Refrigerant Managementposted by Robin Bass on Mar 4, 2010, 2:03 pm
Hello LEED Community at large. . . My mechanical engineer is interpreting this Prereq. based on the LEED Reference Guide for ID&C which states on page 148 under Section 4.... Last reply: Tristan Roberts, Aug 10, 2010, 12:26 pm |
|
Gas / fire suppressantCI-2009 EAp3: Fundamental Refrigerant Managementposted by Vivian Wan on Jul 22, 2010, 12:19 am
LEED Reference Guide states on p.148 under Section 4. Implementation, ". . .only HVAC systems built for the project are within the scope of work." but on p.150 under Section 11. Operations and... Last reply: Tristan Roberts, Aug 10, 2010, 12:20 pm |
|
Spray Foam InsulationNC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Meredith Hunt on Aug 10, 2010, 10:23 am
I am working on a renovation of an existing building and we plan to furr out the interior side of the exterior walls to add spray foam insulation. Does the spray foam insulation fall under any... Last reply: Tristan Roberts, Aug 10, 2010, 10:37 am |
|
Emergency lightingCI-2009 EAp2: Minimum Energy Performanceposted by Vivian Wan on Aug 9, 2010, 11:36 pm
May I know if... Last reply: Paul Conrad, Aug 10, 2010, 8:47 am |
|
Help on filling out LEED online templateNC-2009 EAc1: Optimize Energy Performanceposted by Mike Liu on Aug 4, 2010, 4:06 am
I am filling the LEED online template for EA p2, and I face a problem. Now I can get the building unmet load hours from eQUEST BEPS report, but I don't know how to split the heating unmet load... Last reply: Christopher Schaffner, Aug 9, 2010, 8:28 pm |
|
Does a BAS qualify?EBOM-2009 EAc3.2: Performance measurement - system-level meteringposted by Matthew Macko on Mar 7, 2010, 7:04 pm
Would a building automation system qualify as the submetering system if it could track energy consumption by end-use? Last reply: Christopher Schaffner, Aug 9, 2010, 8:27 pm |