Topic | Recent |
---|---|
Reclaimed White Oak for Materials ReuseCI-2009 MRc3.1: Materials Reuseposted by Alan Bernstein on Nov 29, 2010, 7:32 pm
I am using a reclaimed white oak... Last reply: Tristan Roberts, Nov 29, 2010, 9:38 pm |
|
IEQc1 and IEQc2NC-2009 IEQc1: Outdoor Air Delivery Monitoringposted by Carolina Vergnano on Oct 28, 2010, 7:52 am
If I comply with the IEQc1 using airflow measurement device that measures outdoor air intake flow with accuracy of plus or minus 15% of design minimum outdoor air rate, as defined by ASHRAE 62.1... Last reply: Scott DeGaro, Nov 26, 2010, 12:55 pm |
|
Mechanical floorsCI-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Billy Ng on Nov 26, 2010, 10:29 am
I have a mechanical floor that is boxed in with no windows. this floor is just... Last reply: Scott DeGaro, Nov 26, 2010, 11:57 am |
|
Vending MachinesEBOM-2009 EAc5: Enhanced Refrigerant Managementposted by Laura Girard on Nov 16, 2010, 12:08 pm
We have a number of refrigerated vending machines on our facility that are not owned or operated by the building owner. We could not read any nameplates due to installation and safety concerns... Last reply: Dan Ackerstein, Nov 24, 2010, 4:03 pm |
|
Hi, My project is a CookiesEBOM-2009 EAc1: Optimize Energy Efficiency Performanceposted by Jose Salinas on Nov 24, 2010, 11:04 am
Hi, Last reply: Dan Ackerstein, Nov 24, 2010, 3:57 pm |
|
I have a problem with owners allowing the GC to name the CANC-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by Alfredo Benavides on Sep 15, 2009, 12:28 am
Despite the owner's high level of confidence on his... Last reply: Lannie Farmer, LEED AP BD&C; QCxP, Nov 24, 2010, 2:01 pm |
|
IEQ7.1 Template RequirementsNC-2009 IEQc7.1: Thermal comfort - designposted by susan eguia on Nov 19, 2010, 4:31 pm
Hi, We have Library LEED Project and I'm using the template under LOv3. Can somebody please help me how to fill-up the Clothing level (CLO) and Metabolic Rate (MET)? Appreciate... Last reply: James Del Monaco, Nov 24, 2010, 10:53 am |
|
Thank youGeneral forumsposted by Terry Squyres on Nov 24, 2010, 10:31 am
Thank you to everyone for creating and sharing these guides, and to LEEDuser for making them accessible. |
|
Base line for commutesEBOM-2009 SSc4: Alternative Commuting Transportationposted by Robert McNeice on Jan 12, 2010, 11:48 am
Your Checklists sections says that "The baseline is calculated by assuming that each regular building occupant drives alone to and from the project building twice a day, five days a week, in a... Last reply: Simon Sue, Nov 23, 2010, 9:52 pm |
|
Fire Stopping Caulk and SealantsNC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Lauren Sparandara on Nov 22, 2010, 5:16 pm
What is the... Last reply: Kristy O'Hagan, Nov 23, 2010, 1:28 pm |