Topic | Recent |
---|---|
Pilot Credits 5 & 6 Closing TodayPilot-Credits PC6: Integrative Project Planning & Designposted by Batya Metalitz on Jan 11, 2011, 11:50 am
As a reminder, this credit, and credit 5 will be closing at the end of today (1/11/2011). They will be replaced by Pilot Credit 42: Integrated Process, which is based on the credit currently in... Last reply: Renee Shirey, Jan 11, 2011, 3:14 pm |
|
saving LOv3 formsGeneral forumsposted by Tristan Roberts on Jan 11, 2011, 3:02 pm
Your understanding on both points is correct. If you save the form, you can continue to edit it, until it's submitted for review. |
|
ASHRAE 62.1-2007 section 4CI-2009 IEQp1: Minimum indoor air quality performanceposted by G.J. Teunissen on Nov 10, 2010, 5:12 am
According to this section, a local survey is needed to document the local air quality. But even the... Last reply: G.J. Teunissen, Jan 11, 2011, 2:53 pm |
|
Pilot Credits 5 & 6 Closing TodayPilot-Credits PC5: Preliminary Integrative Project Planning & Designposted by Batya Metalitz on Jan 11, 2011, 11:49 am
As a reminder, this credit, and credit 6 will be closing at the end of today (1/11/2011). They will be replaced by Pilot Credit 42: Integrated Process, which is based on the credit currently in... Last reply: Joanna Rodriguez, Jan 11, 2011, 1:56 pm |
|
VAV System- LEED Online ventilation rate procedure?NC-2009 IEQp1: Minimum indoor air quality performanceposted by Maya Karkour on Jan 5, 2011, 7:50 am
Dear all, As I noticed, the LEED Online letter template for IEQ Prereq1 can not be used for... Last reply: Roger Chang, Jan 11, 2011, 1:13 pm |
|
IEQ p1 occupancy rates for ventilation in international settingsNC-2009 IEQp1: Minimum indoor air quality performanceposted by carol soares on Dec 10, 2010, 12:28 pm
Dears, Last reply: Roger Chang, Jan 11, 2011, 1:11 pm |
|
Pc5- PrelIminary Project PlanningPilot-Credits PC5: Preliminary Integrative Project Planning & Designposted by John Drigot on Oct 19, 2010, 4:35 pm
The LEED Pilot Credit Library Webinar I participated in today was long overdue and much appreciated. I applied for the Pilot Credit program back on 11/18/2009 and it took until 8/6/2010 before... Last reply: Teresa Cheung, Jan 11, 2011, 12:31 pm |
|
Classroom/Lab exhaust fansSchools-2009 IEQp3: Minimum Acoustical Performanceposted by Keelan Kaiser on Jan 11, 2011, 10:17 am
For science labs that have room exhaust fans, how are they considered in the context of background noise? Are they excluded because of infrequent use, or are they typically required to be... Last reply: Daniel Hicks, Jan 11, 2011, 11:58 am |
|
10% exemption and samplingEBOM-2009 IEQc2.3: Occupant comfort - thermal comfort monitoringposted by Wendy Gibson on Nov 5, 2010, 6:21 pm
On the first floor of our building we have restaurants that have their own HVAC system and maintain their own tempatures. The only thing we do is bill them their electricity. Can we exclude them... Last reply: Dan Ackerstein, Jan 11, 2011, 11:13 am |
|
LEED NC TO LEED OMEBOM-2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiencyposted by Avkash Patel on Dec 15, 2010, 5:01 pm
My building initially received one LEED point for Water Use reduction of 20% under LEED NC V2 however, after looking at the original documentation it shows that the actual reduction was 25.2%... Last reply: Avkash Patel, Jan 11, 2011, 11:10 am |