Topic | Recent |
---|---|
Enhanced CommissioningCS-2009 EAc3: Enhanced Commissioningposted by James Thornton on Jun 30, 2010, 6:34 pm
I have a question and a comment. The question first: Is the cost per square foot fee mentioned in the article for Enhanced... Last reply: James Thornton, Jul 5, 2010, 6:09 pm |
|
Green Associate Continuing Education HoursCI-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Summer Gorder on Jul 5, 2010, 5:25 pm
Can someone studying for their Green Associate exam start accumulating their CE hours before they become a Green Associate? Last reply: Tristan Roberts, Jul 5, 2010, 5:31 pm |
|
discrepancy in main meter and sub; calibrationEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Pablo Fortunato Suarez on Jun 22, 2010, 1:19 am
1) if there is a discrepancy between the actual main meter of the energy supplier and the submeter total (sub meter total is around 8 to 10% less), which data should we input for the portfolio... Last reply: Pablo Fortunato Suarez, Jul 5, 2010, 8:07 am |
|
CI 2009 Business centre: Equipment Energy star requirementCI-2009 EAc1.4: Optimize energy performance - equipment and appliancesposted by Gurneet Singh on Jul 5, 2010, 2:26 am
One of our project "Business Centre" is going for CI 2009 ratings system. The project owner is leasing a space in a building and doing the interior layout i.e. lighting , furniture and HVAC. The... Last reply: Lauren Sparandara, Jul 5, 2010, 4:08 am |
|
U values and ci for Climate Zone 2General forumsposted by Christopher Schaffner on Jul 2, 2010, 12:02 pm
A few thoughts. 1) the insulation requirement is only for exposed floors - i.e. floors with the underside exposed to the outdoors. Not "ALL the floors of the building" |
|
calculating the floor areaNC-2009 IEQc8.1: Daylight and views - daylightposted by Emmanuel Pauwels on Jul 1, 2010, 8:23 am
When calculating the floor area for this credit in a residential kitchen, what surface do we actually count? Considering there is one wall with a regrigerator integrated, some cabinets and a... Last reply: Eddy Santosa, Jul 2, 2010, 12:57 am |
|
IEQP1 Natural Ventilation- Outdoor air qualityNC-2009 IEQp1: Minimum indoor air quality performanceposted by Carrie Lai on Jul 1, 2010, 3:17 am
I am doning a new project, and using natural ventilation for one of the rooms. I do read carefully the requirements of IEQP1, but the LEED Guide does not require outdoor air quality test if... Last reply: Carrie Lai, Jul 1, 2010, 11:09 pm |
|
High Reflectance Wood Shingles?NC-2009 SSc7.2: Heat island effect - roofposted by Elliot Powers on Jun 25, 2010, 4:39 pm
Has anyone found a roofing materials company that offers... Last reply: Tristan Roberts, Jul 1, 2010, 11:08 pm |
|
Parking Requirements in areas with no zoning.NC-2009 SSc4.4: Alternative transportation - parking capacityposted by Elizabeth McPherson on Jun 14, 2010, 5:32 pma copy of the ITE study in the office, and wrote about it in this forum post. Gives me a much better idea of why LEED requires it. Too bad about the cost, of course, but lots of data there. Log... Last reply: Tristan Roberts, Jul 1, 2010, 11:05 pm |
|
Rotating Existing Building RenovationsNC-2009 EAc1: Optimize Energy Performanceposted by Mark Benson on May 18, 2010, 4:58 pm
Under the 90.1 Performance Rating Method (PRM), the performance of the baseline building has to be based on the average of 4 separate rotations of the baseline building. This makes sense for new... Last reply: Tristan Roberts, Jul 1, 2010, 10:45 pm |