Determining default occupancy numbersCalculating FTEsposted by Daniela Castro Salgado on Apr 16, 2012, 3:12 pm
Would it be correct to use the "Warehouse, storage" gross square feet per occupant in the Reference Guide for mechanical spaces, storage rooms, loading areas and restrooms of a CS building? Last reply: Daniela Castro Salgado, Apr 23, 2012, 1:35 pm |
|
ANSI 12.60-2002Schools-2009 IEQp3: Minimum Acoustical Performanceposted by M Carolina Weitzman on Apr 20, 2012, 5:39 pm
HELP!!! Where do I find 2002 version of this ansi standard? I can't locate anywhere! Last reply: RETIRED, Apr 23, 2012, 10:58 am |
|
Slow Data EntryLiving with LEED Online - quirks, bugs and hiccupsposted by Brian Baril on Mar 27, 2012, 11:46 am
I am using IE to upload data into the materials credits, and the process is just mind-boggingly slow. To tab between cells on the online form takes a minimum of 10 seconds. Is there any relief... Last reply: Andrew Mitchell, P.E., Apr 23, 2012, 10:22 am |
|
FloorScore Alternative Compliance PathCI-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Tanmay Tathagat on Apr 23, 2012, 6:48 am
I am seeking clarity on the alternative compliance for FloorScore certified materials. Per the User Guide, "100% of non-carpet finished flooring must be FloorScore certified, and must constitute... Last reply: Lauren Sparandara, Apr 23, 2012, 10:01 am |
|
Ceramic Tile, applicable areas for credit complianceCI-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Tanmay Tathagat on Apr 23, 2012, 4:56 amLauren Sparandara Sustainability Manager Google LEEDuser Expert 997 thumbs up April 23, 2012- 9:39 am Hi Tanmay, All flooring materials in your project need to be included, not just regularly occupied spaces with flooring. The tiles comply without testing or certification. Grouts have been discussed a lot in this forum. I would look for low- VOC options despite the fact that it is not necessary (in my opinion) to include grout. Lauren Log in or register to post comments ... Last reply: Lauren Sparandara, Apr 23, 2012, 9:39 am |
|
Pif4 interiorsGeneral forumsposted by dina salah eldin on Apr 21, 2012, 7:44 am
Hi everybody, Last reply: Susan Walter, Apr 23, 2012, 9:20 am |
|
System type and OA inputCS-2009 EAp2: Minimum Energy Performanceposted by Katherine Ann Resurreccion on Apr 21, 2012, 2:54 pm
Hi Everyone! The project that we're working on will be in a country where the local code requires more outdoor air than 62.1 at most of the zone types. I've learned that if the proposed... |
|
Weather data for sizing runsNC-2009 EAc1: Optimize Energy Performanceposted by Francesco Passerini on Apr 20, 2012, 12:42 pm
The equipment capacities for the baseline building design shall be based on sizing runs for each orientation (see G3.1.2.2 and G3.1.2.2.1). I am simulating in an Italian locality and I’m using... |
|
Response to Review Comments in v2009LEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Sheryl Swartzle on Mar 9, 2012, 10:20 am
What do you do when you want to upload a response to review comments but the credit or PI form does not require any uploads thereby not providing an area to upload the response to review... Last reply: Elizabeth Thompson, Apr 20, 2012, 10:00 am |
|
CI 2009: Site area vs footprint?General forumsposted by Diana Nezamutinova on Mar 28, 2012, 6:59 pm
Just to confirm: total site area within the LEED project boundary - is it the total square footage of all floors in a building plus the surrounding premises? Or is it the footprint of the... Last reply: Diana Nezamutinova, Apr 19, 2012, 8:26 pm |