Calculation of replacement cost
NC-2009 MRc3:Materials Reuseposted by Adrienn Gelesz on
Hi, When there is some material that was donated, that actually does not appear in the total material cost (no money actually spent).
How can I calculate Materials and Resources by Default materials cost
NC-2009 MRc3:Materials Reuseposted by mohamed nur hashi on
I am a student and I am working on leed material calculation.
MRc3 and reused furniture
NC-2009 MRc3:Materials Reuseposted by Jeff Wiedmeyer on
My client wants to know what credits might be applicable to the re-use of furniture from another one of its projects for use in the current project. I told the client that I believe the only
Reusing existing concrete slabs
NC-2009 MRc3:Materials Reuseposted by Laura Rebbe on
We are maintaining an existing aircraft hangar floor slab and an adjacent concrete apron for reuse as an equipment parking area.
Receipt Proof Requirements
NC-2009 MRc3:Materials Reuseposted by jupiter luner on
I wanted to clarify something that I recently heard from a contractor on a LEED project.
Materials Reuse-Clarification of credit implementation
NC-2009 MRc3:Materials Reuseposted by Elle Brown on
Can some one clarify if I'm understanding the implementation of this credit correctly? If material is salvaged onsite it must be used in a purpose other than for which it was intended (except for
Calculating materials costs to achieve MR credits
NC-2009 MRc3:Materials Reuseposted by Remigio Antonio Rancan on
Hi all, i don't find Table 2 indicated in LEED reference Guide for green BD+C p. 337. Can anyone help me? Thanks a lot.
Material reuse
NC-2009 MRc3:Materials Reuseposted by Ameet AA on
If the materials are to be reused, ship from another country would it assist for attaining any LEED Credits? As i understand it would not be sustainable in terms of carbon emission.
Dismantling of building
NC-2009 MRc3:Materials Reuseposted by Tanja Arnesson on
Hi, We have a site were four different buildings will be conducted. Within the contract from the municipality demolition of two buildings should be carried out before the new construction.
Re-using shale and theater seating
NC-2009 MRc3:Materials Reuseposted by Michelle Meis on
I am on a project that is installing geothermal. The company that will be drilling the wells is planing on re-using the shale that is removed during the process.