Forum quick links
Seeking feedback for denied credit
NC-2009 EAc1:Optimize Energy Performanceposted by Brian Harris on
Please see below for comments from USGBC relative to our design submittal for Portland Fire & Rescue Station 21 (1000020729). We've sent inquires to USGBC several times with no response.
Baseline HVAC System
NC-2009 EAc1:Optimize Energy Performanceposted by Ciaran McCabe on
Hi, When determining the most suitable Baseline HVAC System to use, as this is a function of building area and number of floors. Would you count a basement car park as a "floor".
Cost of Renewable Energy
NC-2009 EAc1:Optimize Energy Performanceposted by Gregg Achtenhagen on
I am going to be modeling a building that plans on buying landfill gas to burn in boilers which will contribute to EAc2.
Air Filter "Dirty Filter" Allowance in Fan Energy Calcs
NC-2009 EAc1:Optimize Energy Performanceposted by Charles Shinneman on
I cannot find where there is any mention about "air filter loading" allowance requirements for fan power calculations.
Landscape lighting
NC-2009 EAc1:Optimize Energy Performanceposted by Julien Daclin on
Appendix G (Table 3.1) states that lighting power for building facades has to be modeled in the energy simulation.
List of approved LEED modeling Software
NC-2009 EAc1:Optimize Energy Performanceposted by Lawrence Lile on
I find a listing of approved software for LEED energy modeling here http://energy-models.com/blog/list-approved-leed-simulation-software-packages and in the EAp1 leedonline form.
SS - EM
NC-2009 EAc1:Optimize Energy Performanceposted by SSN Energy Model on
Dear All, I am doing Energy Model for Shopping Mall Project. Currently, I am working for Proposed Case. As per the design, the proposed system is 10 no of VRF with COP 3.8.
LPD for space with higher headroom
NC-2009 EAc1:Optimize Energy Performanceposted by William Wong on
Does anyone know what headroom height are based on when ASHRAE design the LPD for space-by-space method (Table 9.6.1) ?
Solar Panels outside LEED project boundary
NC-2009 EAc1:Optimize Energy Performanceposted by Kalyan Nishtala on
Hi, I am currently working on a LEED project which will pursue renewable energy credit and also count the savings towards EAc1 points.