Forum quick links
Upload on LEED Online
Pilot-Credits WEpc115:Whole Project Water Use Reductionposted by Catarina Costa Goncalves on
My understanding is that all documentation for WEpc115 must be uploaded in WE section and and not Innovation. Should the documentation be uploaded in Cooling Tower Water Use?
Cumulative Points
Pilot-Credits WEpc115:Whole Project Water Use Reductionposted by Catarina Costa Goncalves on
Can we still target this credit even if we do not get full points under indoor water use reduction credit?
Points distribution
Pilot-Credits WEpc115:Whole Project Water Use Reductionposted by Diana Rueda on
Assuming we achieve over 65% reduction and achieve 10 points
Are the total points distribution up to us for IWUR, OWUR and Cooling T.?
Baseline Calculation & AHU Condensate
Pilot-Credits WEpc115:Whole Project Water Use Reductionposted by Kim C on
The project is an industrial facility with it's own wastewater treatment system.
WPWUR Innovative ideas question
Pilot-Credits WEpc115:Whole Project Water Use Reductionposted by Carlos De Leon on
Hello, I am exploring APC- WPWUR with my team to achieve more credits.
Irrigation Baseline
Pilot-Credits WEpc115:Whole Project Water Use Reductionposted by Ricardo Sá on
Hi,
LEED Online Submission
Pilot-Credits WEpc115:Whole Project Water Use Reductionposted by Katherine Tich on
We are finalizing our documentation for this ACP, and want to make sure we upload to the correct location. In others' experience, what documentation pathway has been approved?
WEpc115
Pilot-Credits WEpc115:Whole Project Water Use Reductionposted by Leslie Morin on
We’ll pursue the WEpc 115 for our project, considering that it is an alternative compliance path (ACP) for overall water consumption reduction.