Forum quick links
Tenant chilled water metering
CS-v4 EAc3:Advanced energy meteringposted by Eunsun Cho on
Hi all, I have a question regarding the EA Credit: Advanced Energy Metering under LEED v4 BD+C: Core and Shell.
tenants meters data collection requirement
CS-v4 EAc3:Advanced energy meteringposted by Ricardo Sá on
A large office building is being certified using LEED Core & Shell.
Systems requiring metering
CS-v4 EAc3:Advanced energy meteringposted by Tim Nabholz on
Hi All, I am pursuing this credit for a LEED v4 Core and Shell project and am having trouble determining which systems require meters.
Base building Core vs. Tenant Metering
CS-v4 EAc3:Advanced energy meteringposted by Rebecca Hatchadorian on
A large office building is being certified using LEED Core & Shell.
Re: C&S Energy Metering Strategy in Teanat Space
CS-v4 EAc3:Advanced energy meteringposted by Yoyo Shek on
Hi LEED user,
Advanced Energy Metering Owner & Tenant spaces
CS-v4 EAc3:Advanced energy meteringposted by Aishwarya Chengappa on
I have a G+6F C&S office building with 2 office spaces in each floor, which will be metered separately as per the local law.
Base building energy sources
CS-v4 EAc3:Advanced energy meteringposted by Ciaran McCabe on
Hi, I just require come clarification on the Base Build systems.
Tenant metering
CS-v4 EAc3:Advanced energy meteringposted by Patrice McVeigh on
Hi All, I am working on a core and shell office development under LEED V4, the criteria states that meters must be installed for future tenant spaces.
Metering - for tenant energy use or on every floor?
CS-v4 EAc3:Advanced energy meteringposted by Nick Calcagni on
This credit states: "CS Install meters for future tenant spaces so that
tenants will be capable of independently metering energy consumption
Water metering - Lease Agreement
CS-v4 EAc3:Advanced energy meteringposted by CT G on
We are working on a project that provides condensing water for future installation of datacenter AC units for tenants.