Construction IAQ Management Plan—During Construction
Filter by location
Forum
Topic
Replies
Recent

NO HVAC INSTALATION - C&S IEQ Credit 3.1

CS-2009 IEQc3:Construction IAQ Management Plan—During Construction
posted by  Gabriel Yurevich  on 

Hi everybody. We are in the design phase of a CS small building certification. In which we dont project any HVAC installaction in scope.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Sep 4, 2024, 8:01 am

Occupancy date for Core and Shell

CS-2009 IEQc3:Construction IAQ Management Plan—During Construction
posted by  Edgar Arevalo  on 

Regarding the MERV-8 filter section of this credit, which is for a C&S project, no tenant occupancy dates have been established.  Should I just wait til we get the first tenant occupancy d

0
1
Thu May 13, 2010, 1:35 pm

Filter Replacement

CS-2009 IEQc3:Construction IAQ Management Plan—During Construction
posted by  Andrew Ellsworth  on 

BACKGROUND: We have a project that is an office building pursuing LEED-CS 2009 certification. The C&S was substantially complete within the last several weeks.

1
Thu Dec 18, 2014, 4:42 pm

C&S IEQ Credit 3.1

posted by  Maya Karkour  on 
1
Tue Apr 27, 2010, 12:57 pm

Scheduling of Building Flush out for LEED Core and Shell Project

CS-2009 IEQc3:Construction IAQ Management Plan—During Construction
posted by  Sangmin An  on 

Hello, I have a few questions in connection with SCHEDULING of IAQ Management Plan.

1
Mon Nov 4, 2013, 5:58 pm

SMACNA Ductwork Protection Guidelines

CS-2009 IEQc3:Construction IAQ Management Plan—During Construction
posted by  Ciaran McCabe  on 

In order to qualify for this credit is it acceptable if the duct work is wrapped once it arrived on site OR should it arrive pre-wrapped.

1
Tue Nov 8, 2016, 11:52 pm

C&S building with partial occupancy during construction

CS-2009 IEQc3:Construction IAQ Management Plan—During Construction
posted by  Rubén M. R.  on 

Our 23-story building is about to start partial occupancy at floor 12th. The building's AHU will be controlled by a variable speed drive which will regulate automatically the air supply quantity t

1
Mon Nov 21, 2011, 3:35 am

Plastic Sheeting to Protect Raised Technical Floor

CS-2009 IEQc3:Construction IAQ Management Plan—During Construction
posted by  Ian McCall  on 

Hello, The installation contractors state that on previous LEED projects they have placed down plastic sheeting down in order to protect the raised technical floor.

1
Thu Jan 19, 2017, 10:48 am

Scheduling for CS

CS-2009 IEQc3:Construction IAQ Management Plan—During Construction
posted by  BH .  on 

Dear all, we are making Core Shell project. Is it necessary to take into consideration flush out procedure during preparation of IAQ management plan in scheduling point?

1
Mon Nov 21, 2011, 3:30 am