"tenants are not required to install CO2 monitors"?
CS-2009 IEQc1:Outdoor air delivery monitoringposted by Noriko Nagazumi on
From Leeduser.com, CS-2009/IEQc1, Credit Requirements, Potential Technologies & Strategies: "Installation of CO2 sensors in tenant spaces is not required during core and shell construction, and
LEED Core and Shell 2009 (V 3) for IEQ c1, IEQ c5 and IEQ 6
CS-2009 IEQc1:Outdoor air delivery monitoringposted by Himanshu Dehra on
We wish to attempt and submit documentation {LEED Core and Shell 2009 (V 3)} for following credits (with no control on Tenant Spaces): 1. Outdoor Air Delivery Monitoring (IEQ Credit 1); 2. Indoor C
How many CO2 sensors are required per space?
CS-2009 IEQc1:Outdoor air delivery monitoringposted by William Wong on
Credit requires to monitor CO2 level for densely occupied spaces. Is there any requirements for the minimum no. of sensors per space / sq ft?
Calculating CO2 Concentrations in a Zone
CS-2009 IEQc1:Outdoor air delivery monitoringposted by Marcio Alberto Casado Pereira on
Hi! I'm finishing a project and must indicate the levels to be configured in ppm CO2 sensor environments. As an example, I have a training room with 8 people and an area of 497.29 sf.
CO2 in tenant spaces with visual alarm system
CS-2009 IEQc1:Outdoor air delivery monitoringposted by Jatuwat Varodompun on
It seems that scop of CS does not require CO2 sensors to be placed in tanent space.
CO2 sensors in tenanted areas
CS-2009 IEQc1:Outdoor air delivery monitoringposted by Ricardo Sá on
An office building that is being certified under LEED C&S will have 80% of its gross floor area without a complete interior fit-out at time of construction work completion.
Typical Design CO2 Level
CS-2009 IEQc1:Outdoor air delivery monitoringposted by Maya Karkour on
Dear all, I understand that LEED doesn't require you to specify a maximum CO2 level for this credit.
Variable Frequency Drive / Frequency convertors
CS-2009 IEQc1:Outdoor air delivery monitoringposted by Petra Hajná on
Hello everybody. I have a question: Is installation of fan motors with variable frequency drive in main AHUs an acceptable option of outdoor air measurement? I went through credit interpretations,
ERV serving 3 different tenants
CS-2009 IEQc1:Outdoor air delivery monitoringposted by Kristopher Lashley on
We have a project where the building is three separate retail tenants all being served by a single ERV that is supplying 100% of the space outdoor air.
CO2 sensor issue
CS-2009 IEQc1:Outdoor air delivery monitoringposted by G B on
Hello all, I would kindly ask for an information please. My HVAC multizone system, looks like this. VAV AHU system (with sensible heat recovery, no mixing) + Fan Coil Units (FCU).