Post a question or comment
Credit Filters
Optimize Energy Performance
Filter by location
Forum
Topic
Replies
Recent

Revised Points Thresholds APC

CS-2009 EAc1:Optimize Energy Performance
posted by  Anna Korinkova  on 

We would like to clarify the possible Alternative Compliance Paths (ACP) options for the EAc1 (our project is C&S).

4
Tue Aug 31, 2021, 2:24 pm

ASHRAE 90.1-2013 for LEED v2009

CS-2009 EAc1:Optimize Energy Performance
posted by  Elena Arca  on 

Hi, 

I inherited a LEED project during the GBCI review period and I'm trying to make sense of our points for this credit. 

1
Tue Aug 3, 2021, 4:01 pm

Modelling free cooling

CS-2009 EAc1:Optimize Energy Performance
posted by  Ilaria Piong  on 

I have a Core and Shell building where there is an air-to-air heat pump.

5
Thu Dec 17, 2020, 7:13 pm

unmet load hours

CS-2009 EAc1:Optimize Energy Performance
posted by  Elisabetta Annoni  on 

Hi, for the unmet load hours test there is a throttling range to be defined. As I understand from ASHRAE 90.1 there is no fixed value for this range, how shuold it be defined?

4
Tue Nov 3, 2020, 7:01 pm

Baseline HVAC System Selection

CS-2009 EAc1:Optimize Energy Performance
posted by  Ciaran McCabe  on 

I am working on a 9 storey office building (8 levels of office and 1 basement level). The building has a total floor area of 9,400m2.

11
Senior Mechanical Engineer
Metec Consulting Engineers
LEEDuser Basic Member
2 thumbs up
Fri Sep 4, 2020, 2:30 pm

Modeling Future Tenant Spaces

CS-2009 EAc1:Optimize Energy Performance
posted by  Anna Kaelin  on 

As our C&S spaces are a future build out we have to predict what the fan power in our FCUs will be. We have manufactures data for all the potential FCUs that could be connected to the

1
Fri Mar 20, 2020, 6:44 pm

Exemplary Performance?

CS-2009 EAc1:Optimize Energy Performance
posted by  Brian Salazar  on 

Hello!  Is there an Exemplary Performance threshold for this credit?  

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Oct 15, 2019, 5:40 pm
2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Jul 12, 2019, 4:45 pm

Lighting control (occupancy sensor)

CS-2009 EAc1:Optimize Energy Performance
posted by  Christophe Boussuge  on 

Hi all,

I had review back for my ASHRAE 90.1-2007 model for a LEED project (office building) and would need some advice on how to address the subject.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Jul 10, 2019, 6:51 am

90.1-2010 Minimum Equipment Efficiencies

CS-2009 EAc1:Optimize Energy Performance
posted by  Tom Nichols  on 

I have an interesting situation.  I am looking to model a 60 ton (720,000 Btu/hr) WSHP.  The tables 6.8.1 in 90.1 do not identify the efficiency ratings for a WSHP in cooling or heating m

1
Mon Sep 17, 2018, 3:17 pm