CS-2009 EAp2:Minimum Energy Performanceposted by RICARDO GUEMEZ DIAZ on
Hello, In Mexico City we have a one project that is integrated in two phases, the phase one start the construction phase in 2011 and the second phase will start the construction phase the next year
Lighting control in Tenant space
CS-2009 EAp2:Minimum Energy Performanceposted by Indochine Engineering VN on
Hi, I have an open office, restaurant, apartment for rent in the mixed use building project. Im confused with lighting control mandatory section 9.4 ASHRAE.
Eficiency of Electric motors operated with VFD
CS-2009 EAp2:Minimum Energy Performanceposted by Pedro Urazan on
I would like to know if electric motors that are going to be operated by a VFD (Variable Frequency Drive), need to comply with the eficiency requirements of the ASHRAE 90.1 table 10.8. Thanks
Doubt
CS-2009 EAp2:Minimum Energy Performanceposted by Redy Truccolo on
Hi, I'm doing a LEED CS 2009 PRE-certification. My question is: In the "Upload L-4" section, which states: Provide a detailed narrative describing the intended credit approach, including energy ef
the fan power of Systems 9 and 10
CS-2009 EAp2:Minimum Energy Performanceposted by tiantian zhou on
Dear sir/madam, Per the Revised Section 1 4 Tables (Dec 2012), for Systems 9 and 10,the fan power=0.3*supply air flow rate(cfm).
Group projects w/ DES / central plants
CS-2009 EAp2:Minimum Energy Performanceposted by Stacey Olson on
This is with regard to an open air shopping plaza, which is registered as a group project with 7 structures. We received guidance to follow the “Treatment of District or Campus Thermal Energy in
Baseline Building System
CS-2009 EAp2:Minimum Energy Performanceposted by Dave Madsen on
I understand the selection of the base building systems (number of floors, sf, etc.) My question is, if the packaged RTU's are gas fired heat, but the fan powered VAV boxes (in the proposed design
Minimum Energy Performance Calculator Table
CS-2009 EAp2:Minimum Energy Performanceposted by Sivarajah Ragulakeethan on
Hi, We are working on a core and shell project. While filling minimum energy performance calculator table we met with some issues.
Baseline HVAC System for laboratory
CS-2009 EAp2:Minimum Energy Performanceposted by Yu Wang on
I am not clear about explanation from ASHRAE 90.1-2007 User’s Manual: 1. For laboratory spaces with a min.