Renovated spaces or whole building for ASHRAE 62.1
CI-2009 IEQp1:Minimum IAQ Performanceposted by Matt Humphreys on
Hello, We have a project that consists of renovating 3 separate spaces in a large commercial building.
Single Zone served by 2 HVAC systems
CI-2009 IEQp1:Minimum IAQ Performanceposted by Nandana Kumar on
Hi, In our project, a particular zone (Board Room) is being served by 2 systems: central chiller plant through an AHU & by Cassette Units.
IEQp1: Minimum Indoor Air Quality Performance
CI-2009 IEQp1:Minimum IAQ Performanceposted by Arslan Faisal on
We are working on a plaza which have office spaces. we submit this project. But in the review report they asking the following documents.
IEQp1 Design Review told me I have multizone not single
CI-2009 IEQp1:Minimum IAQ Performanceposted by Kasandra Martin on
I have roof top units. Each serves several rooms. One system serves a single room with single thermostat.
Transfer Air for IEQp1 achievement
CI-2009 IEQp1:Minimum IAQ Performanceposted by Ricardo Sá on
Hello, I'm currently working on a project of a huge supermarket. The building has warehouses and storage rooms.
IEQp1 Compliance ?
CI-2009 IEQp1:Minimum IAQ Performanceposted by George Bender on
Office floor of a high rise building trying to obtain LEED sliver. Floor is served by AHU, which serves 30 other floors not in scope. VAV's serve multiple zones on this floor.
IEQp1 using indoor packaged DX units
CI-2009 IEQp1:Minimum IAQ Performanceposted by Edgar Arevalo on
I'm in a bit of a funk. I have a office space that populates two floors of a building.
IAQ Procedure is NOT acceptable?
CI-2009 IEQp1:Minimum IAQ Performanceposted by James Keohane on
I recently received a Design Review comment advising that the IAQ procedure included in Chapter 6 of the ASHRAE 62.1-2007 is not an acceptable tool to demonstrate compliance.
RE:62MZ calc. spreadsheet Vdzd & Ds inputs
CI-2009 IEQp1:Minimum IAQ Performanceposted by Bobby Ghataura on
In the 62MZ calc, i created zones that have heating and potentially critically zones, but im having an issue with the results; for Vdzd, i enter the airflow rate that corresponds to the minimum VAV