Susan,
I am doing something similar for a complex campus project. There are four primary buildings. One is not LEED. Two are LEED NC v2.2 which are my LEED projects. One is LEED NC 2009 by a different LEED Consultant. We cannot use the LEED Online AGMBC documentation path because it is restricted to LEED v2009 only. Instead I am providing common LEED documentation for all three projects, making sure the most strict requirements for the two versions of LEED NC are met.
Long ago --about 2-years-- I decided that the right thing to do to get around the ever changing reviews was to document the entire campus.
We have a total campus occupancy FTE count, with visitors as well as retail customers. We have distributed the bike slots based on estimated usage of each of the four primary buildings.
Not only have we included bikes, but did the same distribution and allocation for carpool parking for SS Credit 4.4 and similar for low-emitting vehicles.
I expect to run into trouble for the location of parking for green cars for SS Credit 4.3. The vehicles are owned by the owner and are parking in an interior secure parking lot. The vehicles are in closest parking spaces to the three LEED buildings but there are closer parking spaces to the the non-LEED building. The trouble with the closer spaces is that they are intended for employee parking which are outside the secure lot.
The two projects will be submitted for review in the next month. I will fill you all in on the results. The owner is pushing for three LEED Platinum projects. We'll see how it goes.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.