By submitting your email, you gain access to hundreds of BuildingGreen articles about green building and innovations and agree that BuildingGreen may send you communications with updates about sustainable design and construction. You may unsubscribe at any time. Terms and Conditions and Privacy Policy apply.
Your email address is safe with us
Thousands of architects, designers, and engineers trust our research and advice... you can trust us with your email address.
BuildingGreen will never share or sell your contact information.
Your email address is safe with us
Thousands of LEED professionals trust our research and advice... you can trust us with your email address.
LEEDuser will never share or sell your contact information.
Loading, please wait a moment...
destination: /, mode: buy
You already have a BuildingGreen account — please enter your password:
Your reset password email has been sent.
Click here to send a password reset link to
Loading...
You are already entitled to LEEDuser premium access through .
To get started, create a personal profile. This will give you full access to LEEDuser Premium through .To get the free reports, please create a personal profile
Loading...
Create your account to join
The most trusted voice in sustainable architecture and design
For more than 25 years BuildingGreen has never accepted ads or sponsorship, making us an unbiased resource you can count on.
“I’ve relied on BuildingGreen for over a decade—it’s one of the most reputable sources for cutting edge green building news & product research.’
—Mara Baum, Sustainability Director, HOK
Thank you for signing up for LEEDuser
IMPORTANT: Please check your email to verify your account.
You are now part of ’s group.
Watch your email for tips from our experts on getting the most from LEEDuser.com.
Here are three special reports you can use today:
Can We Replace Foam Insulation? – There are a lot of reasons to avoid foam, but its high performance can make it a hard habit to kick, as designers are finding out.
How WELL Got Green Building’s Groove Back – WELL is the hottest four-letter word in sustainable design. But will it work to the benefit or the detriment of green building?
20 Ways to Advance Sustainability in the Next Four Years – In this age of political revolution and environmental urgency, it’s time to step back and take a look at priorities, challenges, and opportunities. Here’s our founder Alex Wilson’s take on the best ways to advance sustainability.
Design in space for additional ductwork that might be needed to provide designated exhaust for all garages, high-volume copy rooms, janitors’ closets, science labs, workshops, art rooms, or any other spaces that may be used for mixing and storage of chemicals or hazardous materials.
Entryway systems should be climate-specific. For example, regions with high rainfall may choose high void-volume mats—for trapping dirt below the mat surface and fast drying. In regions where mud and snow are a greater source of contaminants, open-loop entry mats may be more appropriate.
While roll-off mats are acceptable, additional documentation (service contracts and schedules) is required to confirm that the mats will be cleaned on a weekly basis. They cost more up-front, but permanent entryway systems provide better performance, require less maintenance, and are easier to document for LEED compliance.
Determine the type of entryway system that's best for your project. If you install permanent grates, grilles, or slotted entry systems, you will not be required to have a plan for cleaning, although those systems will still need periodic cleaning (less frequently than roll-off mats). However, if you decide to use rollout mats, you'll need to have a contract in place for weekly cleaning. The contract for weekly cleaning can be incorporated into any existing contract but must be clearly spelled out.
Design an adequate space for ten-foot entryway systems at all regularly accessed building entries. Evaluate all other building entrances—such as employee and service doors—for regular use, which may require entryway systems or roll-out mats.
Consider attempting EAc4: Enhanced Refrigerant Management, which is attainable for many projects. Rather than simply avoiding a specific set of chemicals, EAc4 requires you to run calculations on your refrigerant selection that factor in leakage rates and coolant charge, as well as ozone depletion potential (
Together, the owner and design team should set preliminary lighting goals and incorporate them into the Owner’s Project Requirements (OPR) for building
The credit requirements are based on number of occupants for individually occupied spaces and number of spaces for multi-occupant spaces. Only 90% of total building occupants must have controls in individually occupied spaces, but each of the multi-occupant spaces must have independent controls.
Individual control means that there is a switch accessible to each occupant for control over lighting levels at their individual workspace. It can be a task light in an open office scenario, a main-wall sconce in a private office, a ceiling-hung light in living and bedrooms, or a desk light at a reception desk. Keep in mind, though, that in order to count toward the 90% of individually controlled lighting, 90% of occupants must have a dedicated control or task light.