For projects with more than one main entrance, you may draw a circle from more than one entrance. The area contained within the circles drawn from all these radii is then used as your project’s radius.
Together, the owner and design team should set preliminary lighting goals and incorporate them into the Owner’s Project Requirements (OPR) for building
When planning for space allocation to meet credit requirements, consider strategies like merging exhaust systems into a single, main, designated exhaust, or stacking chemical use areas over each other on different floors to minimize ductwork.