Design Development

Adding Division 12 Furniture to your baseline materials budget for this credit is optional, but must be applied consistently across MRc3, MRc4, MRc5, MRc6, and MRc7. Analyze the baseline material budget to see if adding Division 12 furniture works to the

Adding Division 12 Furniture to your baseline materials budget for this credit is optional, but must be applied consistently across MRc3, MRc4, MRc5, MRc6, and MRc7. Analyze the baseline material budget to see if adding Division 12 furniture works to the project’s advantage. Generally, if the furniture helps contribute to the above MR credits it is in a project’s interest to take credit for it—however, it may help with some while making others more difficult.

For specific guidance on which Master Spec Divisions constitute construction material, the LEED Reference Guide for Commercial Interiors is not helpful. Instead, check the LEED Reference Guide for Design and Construction (for NC, CS and Schools) for defin

For specific guidance on which Master Spec Divisions constitute construction material, the LEED Reference Guide for Commercial Interiors is not helpful. Instead, check the LEED Reference Guide for Design and Construction (for NC, CS and Schools) for definitions of construction items per CSI Master Spec Format Divisions 3-10, 31.60 Foundations, 32.10 Paving, 32.30 Site Improvements, 32.90 Planting. (See Resources for Master Spec information.)

Total energy consumption of the building must be tracked, along with any variables that may influence energy consumption. For example, in a hotel you would need to track occupancy. 

Total energy consumption of the building must be tracked, along with any variables that may influence energy consumption. For example, in a hotel you would need to track occupancy. This includes occupancy, schedules, setpoint adjustments, and any other energy usage habits that may differ from default assumptions.