The CxA documents system startup procedures and operations as part of the training manual. While this may seem like a basic step, it is not standard practice, and is essential for when the facilities staff changes or is absent. Specific measures such as s

The CxA documents system startup procedures and operations as part of the training manual. While this may seem like a basic step, it is not standard practice, and is essential for when the facilities staff changes or is absent. Specific measures such as set points, setbacks, controls, and part-load adjustments are can mean the difference between energy efficiency and wastefulness.

The CxA develops a systems manual for the commissioned systems in collaboration with the facilities management—carrying the design intent into building operations. Before occupancy, the CxA verifies the facilities staff is trained to operate the bui

The CxA develops a systems manual for the commissioned systems in collaboration with the facilities management—carrying the design intent into building operations. Before occupancy, the CxA verifies the facilities staff is trained to operate the building systems as intended by the designer. CxA is the only person who has attended design meetings and is continuing their contract into operations to communicate how the controls work and the strategies identified to save energy.

Functional testing, in which the whole system is tested instead of individual components, is a critical part of commissioning. Observations range from larger scale to very basic, such as diffusers supplying more than 10% of the recommended fan rate, outsi

Functional testing, in which the whole system, and depending on scope, individual components are tested, is a critical part of commissioning. Observations range from larger scale to very basic, such as diffusers supplying more than 10% of the recommended fan rate, outside air enthalpy sensor placed in a return air flow instead of supply flow, or incorrect temperature sensor settings.

The commissioning agent’s involvement in team meetings, both in pre-construction and construction, provides the subcontractors the chance to understand the role, tasks and expectations of a CxA. Construction teams benefit from learning how the commissioni

The commissioning agent’s involvement in team meetings, both in pre-construction and construction, provides the subcontractors the chance to understand the role, tasks and expectations of a CxA. Construction teams benefit from learning how the commissioning activities help their job, decrease their onsite presence by taking responsibility for quality control, and reduce contractors’ liability. For example, a malfunctioning air vent, if not commissioned, will eventually be found after months of fault finding and may cause out of pocket expenses for the sub-contractor.

The CxA develops a commissioning report for the owner and project team including reports on all visits, observations and recommendations. A Cx Report is the final deliverable. It lists all of the activities carried out, testing results and recommendations

The CxA develops a commissioning report for the owner and project team including reports on all visits, observations and recommendations. A Cx Report is the final deliverable. It lists all of the activities carried out, testing results and recommendations. Typical recommendations may refer to misbalanced vents, incorrect fan power, incorrect system sizing, dampers not present where specified, and incorrectly installed switches. The CxA is available for a final meeting and to discuss all recommendations for clarifications.

Normal subcontractor testing can often be performed in coordination with commissioning.  Proper coordination of these activities can reduce total commissioning time and reduce system problems. The commissioning process may require additional coordina

Normal subcontractor testing can often be performed in coordination with commissioning.  Proper coordination of these activities can reduce total commissioning time and reduce system problems. The commissioning process may require additional coordination time for subcontractors, which can result in additional contract costs. During the construction team bidding phase, include Cx coordination (at a minimum) in the scope of the mechanical, electrical and controls subcontractors.

The CxA stays abreast of construction progress by attending at least some meetings and receiving updates. As equipment is installed, the CxA verifies installation of equipment to be commissioned, and performs functional testing in collaboration with subco

The CxA stays abreast of construction progress by attending at least some meetings and receiving updates. As equipment is installed, the CxA verifies installation of equipment to be commissioned, and performs functional testing in collaboration with subcontractors, including running the duct system under performance specifications and ensuring that they are balanced as required. The CxA runs the heating and cooling systems to ensure there are no installation problems, and the subcontractor corrects any defects or leaks.