Functional testing, in which the whole system, and depending on scope, individual components are tested, is a critical part of commissioning. Observations range from larger scale to very basic, such as diffusers supplying more than 10% of the recommended fan rate, outside air enthalpy sensor placed in a return air flow instead of supply flow, or incorrect temperature sensor settings.

Credits
Project phase
Credit tip type