ad-100000231

In the third line of the fourth paragraph, remove the text "both" and "and all comparable buildings used for the benchmark" so it becomes the following:Have energy meters that measure all energy use throughout theperformance period of buildings to be certified. Each building\'s energyperformance must be based on actual metered energy consumption forthe LEED project. A full 12 months of continuous measured energydata is required.

ad-100000230

In the third line of the second paragraph, remove the text "both" and "and all comparable buildings used for the benchmark" so the paragraph becomes the following:Have energy meters that measure all energy use throughout theperformance period of all buildings to be certified. Each building\'s energyperformance must be based on actual metered energy consumption forthe LEED project building(s). A full 12 months of continuous measuredenergy data is required.