In the third line of the fourth paragraph, remove the text "both" and "and all comparable buildings used for the benchmark" so it becomes the following:Have energy meters that measure all energy use throughout theperformance period of buildings to be certified. Each building\'s energyperformance must be based on actual metered energy consumption forthe LEED project. A full 12 months of continuous measured energydata is required.

Date
Updated date
Campus Applicable
Off
Internationally Applicable
Off
Ref Guide Name and Edition Pre-v4
Green Building Operations and Maintenance, 2009 edition