Credits
In the third line of the second paragraph, remove the text "both" and "and all comparable buildings used for the benchmark" so the paragraph becomes the following:Have energy meters that measure all energy use throughout theperformance period of all buildings to be certified. Each building\'s energyperformance must be based on actual metered energy consumption forthe LEED project building(s). A full 12 months of continuous measuredenergy data is required.
Date
Updated date
Campus Applicable
Off
Internationally Applicable
Off
Ref Guide Name and Edition Pre-v4
Green Building Operations and Maintenance, 2009 edition