ad-100000343

Replace the second sentence of the paragraph with "Temporary irrigation systems used for plant establishment are allowed only if removed within a period not to exceed 18 months of installation."

ad-100000406

Replace the paragraph text with: Show that the natural ventilation systems design meets therecommendations set forth in the CIBSE manuals appropriate to the projectspace.PATH 1. CIBSE Applications Manual 10: 2005, Natural Ventilation in NondomesticBuildings.PATH 2. CIBSE AM 13:2000, Mixed Mode Ventilation.

ad-100000427

Remove the fourth bullet item:Provide containment (i.e. a closed container for storage for off-site disposalin a regulatory compliant storage area, preferably outside the building) forappropriate disposal of hazardous liquid wastes in places where water andchemical concentrate mixing occurs (e.g., housekeeping, janitorial andscience laboratories).

ad-100000440

In the first line of the first paragraph, insert the text "Achieve significant, measurable environmental performance using a strategy not addressed" before "in the LEED 2009 for New Construction..."

ad-100000443

Insert the following section:Path 3. Pilot Credit (1 point)Attempt a pilot credit available in the Pilot Credit Library atwww.usgbc.org/pilotcreditlibrary. Register as a pilot credit participant andcomplete the required documentation. Projects may pursue more than 1pilot credit; however, a maximum of 1 point will be awarded.