ad-100000077

In the third line of the second paragraph, insert spaces between words so text becomes "...influence on earning MR Credits 1.2: Building Reuse-Maintain 40% or 60% of Interior Nonstructural..."

ad-100000091

Remove the first paragraph: The point of manufacture is considered the place if final assembly ofcomponents into the building product that is furnished and installed bytradesworkers. For example, if the hardware comes from Dallas, andlumber comes from Vancouver, and the joist is assembled in Kent,Washington, then the location of the final assembly is Kent, Washington.

ad-100000090

Replace the paragraph with the text "Excluded from the credit calculation is the salvaged and refurbished material value of reused materials as defined in MR Credit 3.1, Materials Reuse and MRc3.2, Materials reuse - Furniture and Furnishings."

ad-100000089

Replace the last paragraph (beginning with "The replacement values...") with the text "The replacement values used in MR Credit 3.2 are part of the total Division 12 material value, which is also used in the calculations for MR Credit 5. Materials qualifying as reused for MR Credit 3 cannot be applied to MR Credits 1,2,4,6, or 7."