Forum discussion

NC-v4 MPR3:Must comply with project size requirements

Baseline for Projects with Several Physically Distinct Structures

All,

We are currently working on a hotel project, which consists from several buildings the sum of them is about 4,000 square meters. Each individual bulding is not greater than 2,300 square meters.  

Our inquiry is if the Baseline HVAC system must be accordance System 4 (From Table G3.1.1A... Nonresidential and 3 Floors or Less and <2300 m^2  has been selected) or System 6 (From Table G3.1.1A... Nonresidential and 4 or 5 Floors and <2300 m^2 or 5 Floors or less and 2,300 m^2 to 14,000 m^2) 

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.