IP credit Integrative Process

Under the heading "Energy-Related Systems" add the following text:
"Establish an energy performance target no later than the schematic design phase. The target must be established using one of the following metrics:
• kBtu per square foot-year (kWh per square meter-year) of site energy use
• kBtu per square foot-year (kWh per square meter-year) of source energy use
• pounds per square foot-year (Kg per square meter-year) of greenhouse gas emissions
• energy cost per square foot-year (cost per square meter-year)"

EA credit Optimize Energy Performance

Delete the following requirement:
"Establish an energy performance target no later than the schematic design phase. The target must be established using one of the following metrics:
• kBtu per square foot-year (kWh per square meter-year) of site energy use
• kBtu per square foot-year (kWh per square meter-year) of source energy use
• pounds per square foot-year (Kg per square meter-year) of greenhouse gas emissions
• energy cost per square foot-year (cost per square meter-year)"

EA credit Optimize Energy Performance, Step by Step:

Delete bullet point "Establish an energy use intensity (EUI) target no later than schematic design using one of the required metrics noted".