We have a project which will be built on the site of an existing building. Does the demolition of that existing building need to be included in the MRc5 waste diversion calculations? Or is the intent of the credit to apply only to demolition waste created from renovation of an existing building? Is it included only when the existing building demolition is in the LEED project scope? In many cases, an existing building is removed in advance of the LEED project, and the waste not tracked at all. We realize that deconstruction of the existing building would be beneficial, though costly.